Type | Level indicators | The secondary indicators | Nature | AHP | entropy weight method | combination weight |
P | Human resource conservation and occupational health and safety (0.0808) | Saving of human resources A11 | ration | 0.0140 | 0.1011 | 0.0575 |
Occupational health and safety A12 | qualitative | 0.0444 | 0.0000 | 0.0222 | ||
Personnel organization management (0.0943) | Organize and manage green construction personnel A21 | qualitative | 0.0377 | 0.0406 | 0.0391 | |
Coordination of professional subcontracting A22 | qualitative | 0.0226 | 0.0259 | 0.0243 | ||
Personnel change in project department A23 | qualitative | 0.0132 | 0.0485 | 0.0309 | ||
Satisfaction of surrounding residents (0.0719) | Noise control A31 | qualitative | 0.0328 | 0.0525 | 0.0427 | |
Light pollution control A32 | qualitative | 0.0149 | 0.0436 | 0.0293 | ||
Safety and health management (0.1478) | Safety precautions A41 | qualitative | 0.0656 | 0.0149 | 0.0402 | |
Health and epidemic prevention management A42 | qualitative | 0.0338 | 0.0485 | 0.0411 | ||
Fire control facilities A43 | qualitative | 0.0212 | 0.0237 | 0.0224 | ||
Emergency response plan A44 | qualitative | 0.0487 | 0.0393 | 0.0440 | ||
S | Land resources conservation and utilization (0.0568) | Vertical conveyance B11 | qualitative | 0.0250 | 0.0059 | 0.0154 |
The construction of road B12 | qualitative | 0.0146 | 0.0102 | 0.0124 | ||
Effective utilization of temporary facilities B13 | ration | 0.0235 | 0.0344 | 0.0290 | ||
| Saving and utilization of building materials (0.0640) | Local rate B21 | ration | 0.0169 | 0.0007 | 0.0088 |
Loss rate of major building materials B22 | ration | 0.0190 | 0.0229 | 0.0209 | ||
Ratio of waste to building materials B23 | ration | 0.0253 | 0.0051 | 0.0152 | ||
Utilization rate of green materials B24 | ration | 0.0379 | 0.0003 | 0.0191 | ||
Energy conservation and utilization (0.0754) | Proportion of energy saving equipment B31 | ration | 0.0372 | 0.0004 | 0.0188 | |
Power savings B32 | ration | 0.0196 | 0.0546 | 0.0371 | ||
Green energy utilization measures B33 | qualitative | 0.0389 | 0.0001 | 0.0195 | ||
Water resources conservation and utilization (0.0455) | Non-traditional water utilization B41 | ration | 0.0138 | 0.0154 | 0.0146 | |
To save water B42 | ration | 0.0284 | 0.0057 | 0.0170 | ||
Utilization rate of water-saving equipment B43 | ration | 0.0277 | 0.0000 | 0.0138 | ||
R | Protection of surrounding resources (0.0742) | Soil conservation C11 | qualitative | 0.0082 | 0.0187 | 0.0134 |
Measures to prevent settlement around foundation pit C12 | qualitative | 0.0184 | 0.0116 | 0.0150 | ||
Protection of groundwater resources C13 | qualitative | 0.0200 | 0.0182 | 0.0191 | ||
Pipeline protection C14 | qualitative | 0.0217 | 0.0317 | 0.0267 | ||
Environmental protection (0.1405) | Dust management C21 | qualitative | 0.0160 | 0.0639 | 0.0400 | |
On-site enclosure management C22 | qualitative | 0.0132 | 0.0227 | 0.0179 | ||
Toxic substance control C23 | qualitative | 0.0839 | 0.0213 | 0.0526 | ||
Wastewater treatment C24 | qualitative | 0.0438 | 0.0253 | 0.0345 | ||
Construction waste management (0.0687) | Resource reduction C31 | qualitative | 0.0444 | 0.0297 | 0.0371 | |
Garbage disposal C32 | qualitative | 0.0317 | 0.0316 | 0.0317 | ||
Innovative technology and measures (0.0755) | “Four new” technology application C41 | qualitative | 0.0090 | 0.0050 | 0.007 | |
Building assembly rate C42 | ration | 0.013 | 0.1241 | 0.0685 |