We are pleased to announce the successful structural stacking of the Hugin A Wellbay topside module, marking a key milestone in its fabrication. The 30,000-tonne Hugin A Topside will function as the centre platform of the Aker BP ASA -operated Yggdrasil area on the Norwegian Continental Shelf, designed to serve as the processing hub for oil stabilisation, produced water treatment, and subsea injection. Comprising of three decks, the module has been meticulously assembled at the final loadout location at our yard. With structural stacking complete, work now advances to piping, electrical, insulation and installations, reinforcing our commitment to delivering high-quality offshore solutions. Our teams have demonstrated exceptional expertise across detailed engineering, structural fabrication, surface protection, prefabrication of piping and mechanical equipment installation in compliance with NORSOK standards. To mark this achievement, Capt. Rado Antolovic PhD, CEO – Drydocks World along with Sturla Magnus, Executive Vice President New Build from Aker Solutions and Knut Sandvik, Senior Vice President of Projects from Aker BP ASA, along with their teams celebrated this milestone recognising the collective effort that has brought the project to this stage. We thank our teams, our partners and clients, Aker Solutions and Aker BP ASA and look forward to next phase of the project.
-
-
-
-
-
+٢