Excited to be part of this project, installing large diameter foundations using our specialist low headroom drill rigs. A critical part of the process that sets the stage for the next phases – even though we’re off-site before seeing the next steps unfold in the video. Proud to contribute to such an essential stage of the build! https://lnkd.in/gRek6A57
🙌 This is our specialist projects and infrastructure team using their expertise to safely upgrade one of the transmission towers as part of the NSW Government Waratah Super Battery project. We are delivering vital components of the project for Transgrid, modifying 14 substations and four transmission lines, all of which will support an increase in the allowable power to the battery’s 330kV network, keeping Australians connected to the grid. We are proud to partner with Transgrid supporting the modification of the grid and paving the way for a transition to renewables in the future. 🙌 🎥 Video Credit - Aadhavan J. Kasthuri (Zinfra Project Engineer)