Fulan Offshore Engineering Co., Ltd

Fulan Offshore Engineering Co., Ltd

石油天然气

CONNECTING BRINGS FORTUNE

关于我们

Fulan Offshore is a leading Subsea Cable Installer. Fulan Offshore Owns and Operates Cable Vessels and Subsea Equipments. Headquaters in Shanghai, China and branch office in Singapore, Vietnam, Fulan Offshore is dedicated into Cable Installation for our distinguished Clients. Fulan Fulan (福缆) CONNECTING BRINGS FORTUNE.

所属行业
石油天然气
规模
51-200 人
总部
Shanghai
类型
合营企业
创立
2020

地点

Fulan Offshore Engineering Co., Ltd员工

动态

  • Our CLV Fu Yang, continue concentrating in the inter-array cable installation in the Yangjiang Qingzhou 6 Offshore Windfarm since this July. The 330kV export cable has been laid by Our another CLB AilanYiHao (AL-1) early this year, the 66kV inter-array cables will connect the 330kV offshore substation and the 77 wind turbines with total capacity of 1GW which must be lighted by the end of year 2024. The Yangjiang Qingzhou 5 & 6 offshore wind power projects are located in the waters near Yangjiang City, Guangdong Province, China. After completion, the project will become the world's largest deepwater offshore wind power project.

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
      +1
  • Fulan Offshore Engineering Co., Ltd转发了

    CLB Ailan Yihao just gained another new track record of the 330kV HVAC power cable installation successfully in the campaign of the domestic Yangjiang Qingzhou-6 OWF Export Cable construction in Guangdong Province. The performance of the CLB has been greatly developed since upgrading the DP-2 system, the 35km simultaneous lay and burial down to 3 - 4m depth was completed within 4 days only, it is ranked No.1 in the race of the similar level of the export cable installation by 5-6 cable layers in parallel in the Yangjiang OWF which is the biggest Offshore Windfarm development case in China. Equipped with both the 4 x 1800kW propellers and the 6-point mooring system, Ailan Yihao would be more confident to position herself accurately along the cable route and deliver more subsea cable installation projects efficiently against the various marine environments, especially in the offshore windfarms. 

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
      +1
  • CLB Ailan Yihao just gained another new track record of the 330kV HVAC power cable installation successfully in the campaign of the domestic Yangjiang Qingzhou-6 OWF Export Cable construction in Guangdong Province. The performance of the CLB has been greatly developed since upgrading the DP-2 system, the 35km simultaneous lay and burial down to 3 - 4m depth was completed within 4 days only, it is ranked No.1 in the race of the similar level of the export cable installation by 5-6 cable layers in parallel in the Yangjiang OWF which is the biggest Offshore Windfarm development case in China. Equipped with both the 4 x 1800kW propellers and the 6-point mooring system, Ailan Yihao would be more confident to position herself accurately along the cable route and deliver more subsea cable installation projects efficiently against the various marine environments, especially in the offshore windfarms. 

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
      +1

相似主页