Welltec

Welltec

Olie og gas

Innovative technology solutions for the energy industry

Om os

Welltec® is a global technology company that develops and provides efficient, hi-tech solutions for the energy industry. The company was founded in 1994 and grew rapidly by supplying innovative robotic technology to oil and gas operators. In 2010, Welltec introduced a new business segment focused on the development of Completion products. Commercialization of these products began in 2014, and the company is now a global leader in the field of metal expandable packer technology. Welltec’s cutting-edge products and services are designed to optimize the performance and integrity of a well, in any environment. Through advanced engineering and lightweight design, Welltec’s solutions have helped clients increase operational efficiency and reduce carbon footprints in a safe and sustainable way for more than 25 years.

Branche
Olie og gas
Virksomhedsstørrelse
501 – 1.000 medarbejdere
Hovedkvarter
Allerød
Type
Privat
Grundlagt
1994
Specialer
Conveyance Solutions, Wireline Services, Mechanical Solutions, Clean-out Solutions, Milling Solutions, Well Completion Solutions, Subsea Intervention, Oilfield Service Provider og Oil & Gas Interventions

Beliggenheder

  • Primær

    Welltec A/S

    Gydevang 25

    Allerød, 3450, DK

    Se ruten
  • 19424 Park Row, Suite 130

    Houston, Texas 77084, US

    Se ruten
  • Lønningsflaten 1

    Blomsterdalen, Bergen 5258, NO

    Se ruten
  • Marine House

    unit 5b, International Avenue

    Aberdeen, AB21 0BH, GB

    Se ruten

Medarbejdere hos Welltec

Opdateringer

  • Se organisationssiden for Welltec, grafik

    61.868 følgere

    Exciting news! We’re pleased to announce that the Isealate Springblade Patch has won the OWI 2024 Award for Best Example of Well Integrity Innovation. The Isealate Springblade Patch is a unique downhole repair solution, utilizing a pre-rolled laminate steel sheet to remediate damaged or leaking tubing. With only a 4-10 mm effect on the tubing’s inner diameter, this patch-thru-patch solution offers all the benefits of straddles and larger steel patches, but with a more rapid deployment capability and total flexibility for customized relining, repair, and well integrity. We thank OWI for this recognition, and send our congratulations to all the other winners who are helping shape the future of energy. Discover more about the Isealate Springblade Patch and our downhole water shut-off solutions, here: https://bit.ly/3Cv1xKn Offshore Network Ltd.

    • Der er ingen alternativ tekst for dette billede
  • Se organisationssiden for Welltec, grafik

    61.868 følgere

    Reflecting on the highlights from #ADIPEC2024, Welltec is pleased to share the news that our CEO, Peter Hansen, signed an MoU with Ali Foolathi, In Country Value Vice President of ADNOC Group, reaffirming our support for localization initiatives and commitment to exploring opportunities to strengthen manufacturing capabilities in the Middle East. This collaboration plays a key role in facilitating the delivery of our completion technologies, including the Welltec® Annular Barrier (WAB®) which has already seen hundreds of deployments in the region, and paves the way for the diffusion of additional solutions like the 4-in-1 Welltec Expandable Anchor (WEA), designed for optimization and efficiency. welltec.com

  • Se organisationssiden for Welltec, grafik

    61.868 følgere

    When one of our clients in Europe came to us with a challenging well integrity issue stemming from tubing to A-annulus communication, it was crucial that the chosen solution did not affect the tubing’s inner diameter by more than 6 mm. This led to the first-ever deployment of an Isealate Springblade Patch, a unique downhole repair solution utilizing a pre-rolled laminate steel sheet. Well integrity and production were restored with an effect of little more than 4 mm – just fractions of an inch. Get the full story here… https://bit.ly/3Z9LOtB

    Welltec | JNL227232 – Leak remediation with only 4 mm ID reduction

    Welltec | JNL227232 – Leak remediation with only 4 mm ID reduction

    welltec.com

  • Se organisationssiden for Welltec, grafik

    61.868 følgere

    And that’s a wrap for #ADIPEC2024! A huge thank you to everyone who visited the Welltec® booth – we’re truly inspired by the conversations and the enthusiasm surrounding our latest solutions. It’s always a privilege to share insights into cutting-edge technologies like Density Activated Recovery (DAR) and discuss how our innovations can tackle today’s operational challenges. Let’s keep the momentum going! If you'd like to know more about any of Welltec's industry-leading solutions, visit welltec.com or you can find your local contact here --> https://lnkd.in/dR2f8jym

    • Der er ingen alternativ tekst for dette billede
    • Der er ingen alternativ tekst for dette billede
    • Der er ingen alternativ tekst for dette billede
    • Der er ingen alternativ tekst for dette billede
    • Der er ingen alternativ tekst for dette billede
  • Se organisationssiden for Welltec, grafik

    61.868 følgere

    Today, we had the pleasure of hosting ADNOC Drilling CEO Abdulrahman Abdulla Al Seiari at the Welltec booth, engaging in a productive discussion with our CEO, Peter Hansen, regarding Welltec's unique technologies and how they add value across the entire lifecycle of a well. At #ADIPEC2024, we’re showcasing our commitment to optimization and efficiency, highlighting how our solutions enhance operational performance while minimizing environmental impact, and this conversation provided an excellent opportunity to share insights and explore potential collaborations that can drive the future of drilling and completion. We also thank Mohammed Bin Hadi from EMDAD GROUP for facilitating this introduction.

    • Der er ingen alternativ tekst for dette billede
  • Se organisationssiden for Welltec, grafik

    61.868 følgere

    It’s #ADIPEC2024 – Connect with our experts at stand #320 to discover the innovations driving the future of energy! Plus, tomorrow – don’t miss technical session 64: Innovative Real-Time Diagnostic E-line Milling and Fishing Technologies for Enhanced Downhole Fishing Operations, led by CRESCENZO ALTARELLI, Well Services Engineering Specialist at Eni, supported by Muhamed Farhan, Sales Director at Welltec. The presentation features an innovative operation utilizing Welltec’s advanced e-line technologies to retrieve a stuck tubing wall plug without an available fishing neck. In collaboration with Eni, this case highlights effective strategies for overcoming challenges like extended milling lengths and precise force control, offering insights into similar scenarios where conventional methods may fall short.

Tilsvarende sider

Finansiering

Welltec 1 runde i alt

Seneste runde

Privat egenkapital
Læs mere på crunchbase