This document is an excerpt from the EUR-Lex website
Document 62008TB0195
Case T-195/08 R: Order of the President of the Court of First Instance of 15 July 2008 — Antwerpse Bouwwerken v Commission (Application for interim measures — Public procurement — Community tendering procedure — Rejection of tender — Application for suspension of operation and interim measures — Admissibility — Interest in bringing proceedings — Loss of an opportunity — Absence of serious and irreparable damage — No urgency)
Case T-195/08 R: Order of the President of the Court of First Instance of 15 July 2008 — Antwerpse Bouwwerken v Commission (Application for interim measures — Public procurement — Community tendering procedure — Rejection of tender — Application for suspension of operation and interim measures — Admissibility — Interest in bringing proceedings — Loss of an opportunity — Absence of serious and irreparable damage — No urgency)
Case T-195/08 R: Order of the President of the Court of First Instance of 15 July 2008 — Antwerpse Bouwwerken v Commission (Application for interim measures — Public procurement — Community tendering procedure — Rejection of tender — Application for suspension of operation and interim measures — Admissibility — Interest in bringing proceedings — Loss of an opportunity — Absence of serious and irreparable damage — No urgency)
OJ C 247, 27.9.2008, p. 12–12
(BG, ES, CS, DA, DE, ET, EL, EN, FR, IT, LV, LT, HU, MT, NL, PL, PT, RO, SK, SL, FI, SV)
27.9.2008 |
EN |
Official Journal of the European Union |
C 247/12 |
Order of the President of the Court of First Instance of 15 July 2008 — Antwerpse Bouwwerken v Commission
(Case T-195/08 R)
(Application for interim measures - Public procurement - Community tendering procedure - Rejection of tender - Application for suspension of operation and interim measures - Admissibility - Interest in bringing proceedings - Loss of an opportunity - Absence of serious and irreparable damage - No urgency)
(2008/C 247/23)
Language of the case: Dutch
Parties
Applicant: Antwerpse Bouwwerken NV (Antwerp, Belgium) (represented by: J. Verbist and D. de Keuster, lawyers)
Defendant: Commission of the European Communities (represented by: E. Manhaeve, Agent, assisted by M. Gelders)
Re:
Application for interim measures in the context of the tendering procedure launched by the Commission for the construction of a building.
Operative part of the order
1. |
The application for interim measures is dismissed. |
2. |
The costs are reserved. |