Choose the experimental features you want to try

This document is an excerpt from the EUR-Lex website

Document 62008TB0195

Case T-195/08 R: Order of the President of the Court of First Instance of 15 July 2008 — Antwerpse Bouwwerken v Commission (Application for interim measures — Public procurement — Community tendering procedure — Rejection of tender — Application for suspension of operation and interim measures — Admissibility — Interest in bringing proceedings — Loss of an opportunity — Absence of serious and irreparable damage — No urgency)

OJ C 247, 27.9.2008, p. 12–12 (BG, ES, CS, DA, DE, ET, EL, EN, FR, IT, LV, LT, HU, MT, NL, PL, PT, RO, SK, SL, FI, SV)

27.9.2008   

EN

Official Journal of the European Union

C 247/12


Order of the President of the Court of First Instance of 15 July 2008 — Antwerpse Bouwwerken v Commission

(Case T-195/08 R)

(Application for interim measures - Public procurement - Community tendering procedure - Rejection of tender - Application for suspension of operation and interim measures - Admissibility - Interest in bringing proceedings - Loss of an opportunity - Absence of serious and irreparable damage - No urgency)

(2008/C 247/23)

Language of the case: Dutch

Parties

Applicant: Antwerpse Bouwwerken NV (Antwerp, Belgium) (represented by: J. Verbist and D. de Keuster, lawyers)

Defendant: Commission of the European Communities (represented by: E. Manhaeve, Agent, assisted by M. Gelders)

Re:

Application for interim measures in the context of the tendering procedure launched by the Commission for the construction of a building.

Operative part of the order

1.

The application for interim measures is dismissed.

2.

The costs are reserved.


Top
  翻译: