À propos

A global player in construction, born from the merger with Eurovia, VINCI Construction brings together more than 1,000 companies and 119,000 employees in over 100 countries. Its expertise covers all aspects of building, civil engineering works, infrastructure, and specialized activities related to construction and public works. VINCI Construction is characterized not only by the breadth of its expertise but also by an economic model structured around three complementary components. A network of local businesses, in France and internationally, that bring together all expertise in both public works and building construction; Specialized trades carried out worldwide by the entities of Soletanche Freyssinet (Soletanche Bachy and Ménard for foundations and ground technologies, Terre Armée and Freyssinet for structures, Nuvia for nuclear, Sixense for digital solutions); A division dedicated to the management and execution of complex projects, with VINCI Construction Grands Projets, Spiecapag, and Dodin Campenon Bernard, which operate in the market for large-scale civil engineering and construction projects, both in France and internationally. VINCI Construction is the incubator of the entrepreneurial culture of the VINCI Group and its management framework, which combines decentralization, networking, autonomy, and individual responsibility of management, employee development, and organizational responsiveness.

Secteur
Construction
Taille de l’entreprise
+ de 10 000 employés
Siège social
Rueil-Malmaison
Type
Société cotée en bourse
Domaines
Construction, Grands Projets, Génie civil spécialisé, Dragage, travaux maritimes et fluviaux, dépollution des sols, activités offshore et éoliennes et Fondations et technologies du sol, structures, nucléaire

Lieux

Employés chez VINCI Construction

Nouvelles

  • Among the 50 projects launched by Leonard for its 2025 incubation and acceleration programs, a game-changing solution from our subsidiary DODIN CAMPENON BERNARD. 💡 What's the innovation? A new software tool for structural calculations, developed by @Christel Semaan at Dodin Campenon Bernard, designed to replace long, error-prone processes with a fast, reliable solution. 🔧 Why does it matter? This tool simplifies structural calculations, saving time and reducing errors. It's a huge leap forward in making our processes smarter and more efficient. At VINCI Construction, we proudly empower our teams to lead innovation to #BuildBetterTogether. To learn more about our innovative solutions, see our previous post: https://lnkd.in/eyDc6-vy #VINCIConstruction

    Voir la page d’organisation pour DODIN CAMPENON BERNARD, visuel

    26 859  abonnés

    La semaine dernière, Leonard a accueilli 50 projets innovants dans leurs programmes d’incubation et d’accélération 2025 lors du Launch Day 2025. Chaque année, Leonard sélectionne des projets et start-up ambitieux qui transforment les secteurs de la construction, des infrastructures et de l’énergie. Pour cette promotion 2025, l’accent est mis sur des thématiques clés comme la robotique, les nouveaux matériaux, l’adaptation au changement climatique ou encore l’intelligence artificielle.   Parmi ces 50 solutions, nous sommes fiers de voir figurer un projet développé au sein du BET de Dodin Campenon Bernard. Porté par Christel Semaan, ce projet propose une solution logicielle #innovante pour les calculs structure, conçue pour simplifier les processus actuels.   Aujourd’hui, les calculs structure se basent souvent sur des modélisations longues et des feuilles Excel bricolées, sources de perte de temps et d’erreurs. Notre solution vise à offrir un outil pratique, efficace et fiable, répondant aux besoins des bureaux d’études et des ingénieurs. Un projet collaboratif qui incarne l’esprit d’innovation de Dodin Campenon Bernard et notre #engagement à relever les #défis de notre secteur. #BuildBetterTogether

    • Aucune description alternative pour cette image
    • Aucune description alternative pour cette image
    • Aucune description alternative pour cette image
    • Aucune description alternative pour cette image
  • 🗓 THE LATEST NEWS: the year is off to a strong start! Some of our teams have 𝘀𝗲𝗰𝘂𝗿𝗲𝗱 𝗻𝗲𝘄 𝗰𝗼𝗻𝘁𝗿𝗮𝗰𝘁𝘀, while others have successfully 𝗰𝗼𝗺𝗽𝗹𝗲𝘁𝗲𝗱 𝗸𝗲𝘆 𝗽𝗿𝗼𝗷𝗲𝗰𝘁𝘀. Additionally, some teams have been making a difference through 𝘃𝗼𝗹𝘂𝗻𝘁𝗲𝗲𝗿 𝗶𝗻𝗶𝘁𝗶𝗮𝘁𝗶𝘃𝗲𝘀. Eurovia - ETF - Botte Fondations- VINCI Construction Grands Projets - DODIN CAMPENON BERNARD - Bachy Balineau Antilles Guyane - VINCI Building UK - Seymour Whyte This diversity of projects highlights VINCI Construction's wide-ranging expertise: we #BuildBetterTogether. 🤝

  • Voir la page d’organisation pour VINCI Construction, visuel

    492 761  abonnés

    🚇 45 meters underground, 8 years of work, and a new metro hub delivered! With the completion of Villejuif - Gustave Roussy station, the #GrandParisExpress reaches another key milestone. This new hub between metro lines 14 and 15 required meticulous engineering and coordination. From managing simultaneous tunneling operations to precisely positioning a 3,200-ton structure, our teams (DODIN CAMPENON BERNARD, VINCI Construction en France, Botte Fondations, and VINCI Construction Grands Projets) have delivered a major infrastructure that will smooth daily commutes for Paris and its suburbs. Congratulations to everyone who made this achievement possible! 👏 Want to know more about our role in transforming Paris' public transportation? 👉 See our previous post here: https://lnkd.in/eTYWDMsX

    Voir la page d’organisation pour DODIN CAMPENON BERNARD, visuel

    26 859  abonnés

    Après 8 années de travaux, nous sommes fiers d’annoncer la livraison de la station Villejuif - Gustave Roussy, un ouvrage clé du #GrandParisExpress, conçue à 45 m de profondeur pour accueillir le croisement des lignes 14 et 15. Sur ce projet d’exception, Dodin Campenon Bernard a mis en œuvre des solutions #techniques ambitieuses et #innovantes pour transformer ce carrefour stratégique en réalité. Retour sur les grandes étapes de ce défi technique :  • Un croisement complexe à 45 m sous terre : la station a été conçue autour d’un pont cadre permettant au tunnelier de la ligne 14 d’enjamber celui de la ligne 15, tout en optimisant les dimensions du puits. Grâce à un travail collaboratif entre nos bureaux d’études et les équipes terrain, un phasage précis a permis de réaliser le pont cadre sans interrompre la progression des tunneliers des deux lignes.  • Une coactivité maîtrisée : en 2020, les tunneliers des lignes 14 et 15 se sont croisés, une première pour le Grand Paris Express ! Nos équipes ont dû gérer la logistique complexe, y compris l’utilisation d’un portique de manutention pour le passage du tunnelier et le montage des structures provisoires.  • Le vérinage d’un ouvrage de 3 200 tonnes : une opération de haute précision a permis de déplacer le pont cadre sur 1,73 m pour sa mise en place définitive, tout en respectant les contraintes serrées des deux chantiers. Les efforts conjoints des équipes Dodin Campenon Bernard, VINCI et SPIE ont permis : ✔️ Une mutualisation des études entre les structures et les méthodes. ✔️ Des phasages optimisés grâce à un modèle 3D unique. ✔️ Une parfaite gestion des interfaces entre deux lignes de métro avec deux maîtres d'ouvrage. Merci à toutes les équipes mobilisées pour leur #engagement, leur #expertise et leur capacité à relever des #défis hors normes ! (Re)découvrez ce projets emblématique en images 👇 Maîtres d’ouvrage : RATPgroup et Société des grands projets Maitre d'œuvre : setec Groupement : DODIN CAMPENON BERNARD, Spie batignolles TPCI, VINCI Construction en France, VINCI Construction Grands Projets, Botte Fondations et SPIE BATIGNOLLES FONDATIONS Crédits photos : Grand Paris Express

    • Aucune description alternative pour cette image
    • Aucune description alternative pour cette image
    • Aucune description alternative pour cette image
    • Aucune description alternative pour cette image
    • Aucune description alternative pour cette image
      +8
  • Voir la page d’organisation pour VINCI Construction, visuel

    492 761  abonnés

    🚨 𝗡𝗲𝘄 𝗰𝗼𝗻𝘁𝗿𝗮𝗰𝘁 𝗮𝗹𝗲𝗿𝘁: channel construction for Port 2000 in Le Havre 👷👷♀️ Our teams from Terélian (lead) and Océlian will create a channel directly connecting Port 2000 to the Seine for HAROPA PORT (the leading French port group for maritime, river, and rail logistics). This key infrastructure will boost river freight transport, reducing carbon emissions and securing container flows to and from Île-de-France, France’s largest employment and consumption area. ✔️ 1.8 km channel with a protective dike ✔️ Direct link to the Seine to expand river freight use ✔️ Lower carbon footprint for greener supply chains This project builds on VINCI Construction's 𝗲𝘅𝗽𝗲𝗿𝘁𝗶𝘀𝗲 in port and fluvial infrastructure. It also highlights 𝘀𝘆𝗻𝗲𝗿𝗴𝗶𝗲𝘀 within our group VINCI, as VINCI Energies will install shore power at Le Havre’s cruise terminal—supporting more 𝘀𝘂𝘀𝘁𝗮𝗶𝗻𝗮𝗯𝗹𝗲 port operations! https://lnkd.in/e2DVrnv3

    Voir la page d’organisation pour VINCI, visuel

    608 370  abonnés

    [Nouveau contrat ⚓️] VINCI remporte la construction de l’accès fluvial à Port 2000 au Havre - Création d’un chenal de 1,8 km pour le premier port français - Connexion directe de Port 2000 avec le bassin de la Seine afin de développer le trafic par voie fluviale - Contrat de 183 millions d’euros HAROPA PORT, premier port français, a attribué au groupement composé de VINCI Construction (62 %) - à travers sa filiale Terélian (mandataire) - et de DEME Group (38 %) - société belge dans laquelle VINCI détient 12,1 % - la réalisation de l’accès fluvial « La Chatière* » au Port 2000 au Havre (Seine Maritime). D’un montant de 183 millions d’euros, ce projet englobe la construction d’un chenal fluvial d’une longueur de 1 800 mètres, protégé par une digue. En 2027, il mettra en communication directe Port 2000 avec le bassin de la Seine, plus grande zone d’emploi et de consommation de France. L’accès fluvial direct au port permettra de décarboner la chaîne logistique en sécurisant et en augmentant le nombre de conteneurs transportés par voie fluviale. Ce chantier maritime complexe comprend une phase préalable de dépollution pyrotechnique et nécessite une mobilisation d’expertises importante. Le groupement s’appuiera également sur d’autres filiales de VINCI Construction : Océlian pour les travaux maritimes ainsi que NAVARRA TS et CARDEM PYRO pour la dépollution de sols et pyrotechnique. Ce nouveau projet confirme l’expertise reconnue de VINCI Construction dans le domaine des aménagements maritimes. En France, les filiales de VINCI Construction ont réalisé l’aménagement du port de pêche de la Cotinière (Île d’Oléron, Charente-Maritime) et l’extension du port maritime de Brest (Finistère). Actuellement, elles sont mobilisées sur l’aménagement du port de plaisance de Porto-Vecchio (Corse) et sur l’extension du port de commerce de Port-la-Nouvelle (Aude), ainsi que sur l’électrification de trois quais du terminal croisières au Havre, pour HAROPA PORT, en synergie avec VINCI Energies. *Le projet de « La Chatière », dont le financement est porté par la Région Normandie, l’État, l’Union européenne (via le Mécanisme pour l’interconnexion en Europe) et HAROPA PORT, vise à répondre aux enjeux de multimodalité et de décarbonation de l’axe Seine.

  • VINCI Construction a republié ceci

    Voir la page d’organisation pour VINCI, visuel

    608 370  abonnés

    On the occasion of the presentation of the Group's annual results, Xavier Huillard, VINCI’s Chairman and CEO, made the following comments: "VINCI achieved a very high level of performance in 2024. Revenue growth was accompanied by a further improvement in earnings despite higher taxation on French motorways. Free cash flow hit a new all-time high. The recovery in air traffic continued in 2024. VINCI Airports’ annual passenger numbers are now higher than their pre-Covid levels, and its contribution to Group earnings increased. At VINCI Autoroutes, traffic levels were stable despite protests that blocked motorways in the first half of the year. The main event was the introduction of France’s new tax on long-distance transport infrastructure operators, which had a major negative impact on earnings. The financial performance of the Energy business, made up of VINCI Energies and Cobra IS, was particularly strong. That business accounts for almost 40% of the Group’s total business activity. Its markets are very buoyant and are being driven in particular by the energy transition, digital transformation and the increasing need for sustainable mobility. These megatrends are also supporting business levels and order intake at VINCI Construction, where operating margin continued to improve in 2024 as a result of a selective approach to new business and rigorous project execution. The combined order book of the Energy and Construction businesses hit a new record at the end of the year. In a more uncertain economic and geopolitical environment, the Group has thus good visibility on its future business levels and has begun 2025 in a quietly confident mood. VINCI’s international presence increased further in 2024, in line with the Group’s long-standing strategy. It now generates 58% of its revenue and the majority of its net income outside France. International business accounts for 70% of its order book. […] The increase in debt resulting from these developments was limited by the Group’s outstanding cash flow. As a result, 2024 further demonstrated the strength of VINCI’s business model, in which businesses with different and complementary cycles – Concessions, Energy and Construction – are combined within a single group. Supported by a strong entrepreneurial culture, VINCI’s highly decentralised organisation is an important attribute that gives autonomy to its companies and makes them agile and responsive to the constant changes in their markets. Pierre Anjolras will take over as the Group’s Chief Executive Officer after the next Shareholders’ General Meeting. Following in the footsteps of his predecessors, he will be able to rely on the women and men of VINCI, its greatest asset."

    • Aucune description alternative pour cette image
  • Voir la page d’organisation pour VINCI Construction, visuel

    492 761  abonnés

    Every year, more than 18 million people are diagnosed with cancer. We are committed to supporting our employees through these challenges at VINCI Construction. In 2023, we signed the Cancer@Work charter, allowing concrete actions such as practical guides to assist employees and managers or coaching programs to ease the transition back to work after long-term illness. Our subsidiaries were also actively involved in 2024, through charitable and awareness-raising actions, for example: 🔸 CIMESA (Mexico): Early cancer screenings for the women employees. 🔸 Civil Engineering teams (France): Breast cancer awareness workshops. 🔸 Ringway Jacobs (UK): Fundraising for cancer research through charity events. Check out the link in the comments for more details on our commitments and initiatives. #VINCIConstruction #BuildBetterTogether #WorldCancerDay

    • Aucune description alternative pour cette image
  • Voir la page d’organisation pour VINCI Construction, visuel

    492 761  abonnés

    Let's ride in Val de Cher, France 🚴 Eurovia’s Blois team and Terélian are developing the “Cœur de France à vélo” route: 🛣️ 70 km of earthworks, gravel, paving, and rock installations designed for durability and cyclist comfort. ♻️ Sustainable materials and eco-friendly techniques that minimize the route’s environmental impact while maximizing performance and longevity. 🤝 Over 3,230 hours dedicated to professional integration, combining innovation with social impact. Through projects like this, our teams contribute to making cycling an enjoyable and sustainable option. Congratulations to them! 👏 #VINCIConstruction #BuildBetterTogether

    Voir la page d’organisation pour VINCI Construction en France, visuel

    220 416  abonnés

    #ProjetEnCours 🚴♂️ Une nouvelle étape pour la mobilité douce dans le Val de Cher Les équipes de l’agence Eurovia de Blois, accompagnées par Terélian, mènent les travaux de l’aménagement de la véloroute ""Cœur de France à vélo". 🛣️ Ce projet qui s'étend sur près de 70 km, reliera Chartres-sur-Cher à Chissay-en-Touraine en longeant le canal de Berry et les rives du Val de Cher. Les travaux incluent le décapage, l’empierrement, l’application d’enrobés et des aménagements d’enrochement, le tout pensé pour garantir durabilité et confort aux cyclistes.  🤝 Avec 3 230 heures d’insertion professionnelle réalisées, ce chantier allie innovation technique et engagement social en renforçant l'impact social du projet. #Route

    • Aucune description alternative pour cette image
    • Aucune description alternative pour cette image
    • Aucune description alternative pour cette image
    • Aucune description alternative pour cette image
    • Aucune description alternative pour cette image
  • Voir la page d’organisation pour VINCI Construction, visuel

    492 761  abonnés

    🛫 Burkina Faso airport: ready to take off! After three years of construction and with the dedication of 800 team members, the new Donsin International Airport in Burkina Faso is now open! This ambitious project features a 3,500-meter runway, 117,000 m² of parking areas, cutting-edge airfield systems, and extensive drainage works across 320 hectares. 🤝 Partnering with the University 2iE of Ouagadougou, our teams incorporated low-carbon cement solutions, significantly reducing CO₂ emissions. Congratulations to everyone involved in this project! 👏 Our subsidiaries build and upgrade international airports to improve connectivity, support economic growth, and set new standards for sustainability. #VINCIConstruction #BuildBetterTogether Interested in such projects? Check our previous post on Marseille's airport: https://lnkd.in/e4vBUn2t

    Voir la page d’organisation pour Sogea-Satom, visuel

    184 528  abonnés

    🇧🇫 Burkina Faso | Fin des travaux de construction des chaussées aéronautiques du nouvel #aéroport international de #Donsin ✈️ Après 3 ans de travaux, 800 personnes mobilisées et une aventure humaine intense, nos équipes locales sont fières d'annoncer l'achèvement de ce projet d'envergure ! 🎉   🔧 Une réalisation à fort #impact pour le pays : • Piste d'atterrissage et voies de circulation • Balisage aéronautique CAT II & Éclairage des aires de stationnement • 117 000 m² de Parkings aéroportuaires  • Aménagements et assainissement sur 320 hectares • Travaux d'Oléoréseau   🌍 Un projet également innovant ! Grâce à un partenariat avec l'Université 2iE de #Ouagadougou, nous avons intégré des solutions bas-carbone dans les ouvrages en béton pour réduire les émissions de carbone du ciment. 🔑 Objectif : réduire l'utilisation de clinker dans le ciment avec des substituts comme le laitier de hauts fourneaux de l'usine Cim-Metal du Burkina Faso.   👏 Félicitations et un grand merci à toutes les personnes engagées dans ce projet : • Nos équipes, • Nos partenaires et fournisseurs, • La maîtrise d’ouvrage de l'Aéroport de Donsin ( MOAD), • Et les autorités du pays pour investissement et leur confiance.   #BuildBetterTogether 🌟 #Afrique #Construction 🚧 #BurkinaFaso 🇧🇫 #Innovation

    • Aucune description alternative pour cette image
    • Aucune description alternative pour cette image
  • Voir la page d’organisation pour VINCI Construction, visuel

    492 761  abonnés

    Reaching for the sky in Warsaw: Skyliner II 🌆 Standing at 130 meters with 28 floors, this office tower demands precision and expertise from our subsidiaries, Soletanche Polska and Warbud S.A. The project requires 80 cm thick foundation walls, 32 meters deep, with 78 reinforcing columns for stability and waterproofing. All of this is done in a tight 2,000 m² space, surrounded by busy city infrastructure! ✔️ This project demonstrates that we can overcome logistical and technical challenges through brilliant planning and execution. Skyliner II is shaping up to be a landmark! Congratulations to our teams for handling this project so well. 👏 #BuildBetterTogether #VINCIConstruction

    Voir la page d’organisation pour Soletanche Bachy, visuel

    75 357  abonnés

    🚧 Soletanche Polska progresse sur le chantier Skyliner II à Varsovie ! Soletanche Polska réalise les fondations du futur immeuble de bureaux Skyliner II avec Warbud S.A. (entreprise générale) pour le compte de Karimpol Poland. Situé dans le quartier d'affaires de Wola à Varsovie, ce nouvel édifice, d'une hauteur de 130 mètres, comptera 28 étages avec un parking souterrain de cinq niveaux. 🔢 Le chantier en chiffres… 🔹 Parois moulées : 80 cm d'épaisseur, 32 m de profondeur, 4 850 m² de béton 🔹 Profondeur des barrettes : 38 m 🔹 Colonnes de jet grouting : 78 colonnes pour renforcer l'étanchéité des fondations 🔧 Un projet complexe en raison de sa localisation Skyliner II est un projet particulièrement exigeant, car le chantier est situé en plein centre de Varsovie, où se côtoient de nombreux immeubles de bureaux, magasins et infrastructures de transport très fréquentées. 👷♂️Dawid Skowroński, chef de projet, raconte : « Un des défis majeurs a été l'installation de nombreuses barrettes dans un espace réduit de 2000 m². Nous avons également dû creuser une tranchée pour les parois moulées du puits de service, allant jusqu'à 38,5 mètres de profondeur. Un véritable challenge technique ! 👏 Félicitations aux équipes pour ce projet ! #buildonus #SoletanchePolska #construction #foundations #warsaw

    • Aucune description alternative pour cette image
    • Aucune description alternative pour cette image
    • Aucune description alternative pour cette image
    • Aucune description alternative pour cette image
    • Aucune description alternative pour cette image
      +1
  • Voir la page d’organisation pour VINCI Construction, visuel

    492 761  abonnés

    Redesigning Poitiers' urban space without disturbance To ensure construction runs smoothly for the community, up to five teams worked simultaneously last summer, with nighttime shifts minimizing noise and disruptions. Thanks to a smart phasing strategy, access to shops, schools, and homes has been maintained in the city. 👷👷♀️ 𝗪𝗵𝗮𝘁'𝘀 𝘁𝗵𝗲 𝗽𝗿𝗼𝗷𝗲𝗰𝘁 𝗮𝗯𝗼𝘂𝘁? Eurovia's teams from Poitiers are transforming Rue du Faubourg du Pont-Neuf, a key street in Poitiers with 15,000 daily vehicles, into a sustainable mobility model and better living conditions. The project, which includes 2 135 hours of local integration, focuses on: 🚴♂️ Bike lanes to encourage eco-friendly travel 🚶♂️🚶♀️Safer, wider sidewalks to make walking more comfortable ✔️Use of advanced materials to improve road safety and durability 🌧️ A smart system for managing rainwater and preventing flooding 🌿 A greener landscape thanks to new plantings 🌿 Congratulations to the teams involved! 👏 #VINCIConstruction #BuildBetterTogether

    Voir la page d’organisation pour Eurovia, visuel

    177 493  abonnés

    Réaménagement de la rue du Faubourg du Pont-Neuf à Poitiers (86) 🚛 Avec ses 15 000 véhicules par jour, la rue du Faubourg du Pont-Neuf est un axe majeur de Poitiers, reliant le centre-ville à sa partie est, mais dessert aussi une zone pavillonnaire, le CHU de Poitiers et le campus universitaire. Pour ce projet, les équipes Eurovia de Poitiers travaillent depuis novembre 2023 jusqu’à mars 2025. L'objectif est de repenser l'espace urbain en donnant une plus grande place aux mobilités douces et en améliorant la qualité de vie des habitants. Les équipes sont mobilisées pour : - Créer des pistes cyclables en enrobés bruns pour favoriser les mobilités douces 🚴♂️ - Aménager des trottoirs en pavés et en enrobés beige, améliorant la sécurité et rafraîchissant les espaces piétons - Utiliser des enrobés Goasq sur les plateaux surélevés pour une meilleure sécurité routière - Reprofiler les chaussées pour optimiser la gestion des eaux de pluie vers un bassin existant 🌧️ - Végétaliser la rue en plantant des arbustes, vivaces et plantes grimpantes 🌿 Pendant l'été 2024, jusqu'à cinq équipes ont été mobilisées pour réaliser une grande partie des travaux, avec des interventions de nuit afin de limiter les nuisances pour les riverains et maintenir la circulation autant que possible. Le phasage des travaux garanti également l'accès aux commerces, aux écoles et aux résidences tout au long du chantier. Grâce à ce chantier, 2 135 heures d'insertion seront offertes à des personnes éloignées de l'emploi.

    • Aucune description alternative pour cette image
    • Aucune description alternative pour cette image
    • Aucune description alternative pour cette image
    • Aucune description alternative pour cette image

Pages affiliées

Pages similaires

Parcourir les offres d’emploi