Chennai Metro Rail

Chennai Metro Rail

Rail Transportation

Chennai, Tamil Nadu 18,543 followers

Welcome to the official LinkedIn page of Chennai Metro Rail Limited

About us

The Government of Tamil Nadu created a Special Purpose Vehicle (SPV) for implementing the Chennai Metro Rail Project. This SPV named as "Chennai Metro Rail Limited" was incorporated on 03.12.2007 under the Companies Act. It has now been converted into a Joint Venture of the Government of India and Government of Tamil Nadu with equal equity holding.

Industry
Rail Transportation
Company size
201-500 employees
Headquarters
Chennai, Tamil Nadu
Type
Government Agency
Founded
2007

Locations

Employees at Chennai Metro Rail

Updates

  • INNOVAC2024: A Deep Dive into Tunnel Ventilation Technology and Air Conditioning System Chennai Metro Rail Limited in association with the Indian Society of Heating, Refrigerating and Air Conditioning Engineers (ISHRAE), hosted the INNOVAC2024 seminar today (07.12.2024) at MetroS, Auditorium in Nandanam, Chennai. This exclusive event aims to provide insights into innovative and energy-efficient design and operation of tunnel ventilation and air conditioning systems. The conference covered the several topics namely Innovations in Tunnel Ventilation system design by CMRL, Good Installation, Testing, and Commissioning (T&C) practices of VRF systems, Energy-Efficient design standards for HVAC system equipment, New Fan FEI design Index as per NBC, Fire safety and security of large commercial spaces, Air handling units Design and Certification standards, SCADA and BMS systems Architecture, Air and water side testing and balancing methods. Additionally, interactive sessions and stalls of prospective vendors of equipment and services were also arranged as part of the Seminar. The INNOVAC2024 was inaugurated by Thiru. M.A. Siddique, I.A.S., Managing Director, CMRL in the presence of Thiru. Gopinath Mallya, Chief Advisor (O&M), Thiru. Hari Prasad, AGM (Mechanical Systems and GC services), CMRL, Thiru B. Sankaranarayanan, Director, Adithya Engineers along with Senior officials and staff of CMRL, ISHRAE were present during the occasion. #chennaimetro #cmrl #chennai #metrorail #technology

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
      +1
  • Issue of Letter of Acceptance to M/s. BEML Limited for procurement of 70 Driverless 3-Car Trains funded by Japan International cooperation Agency (JICA) for Corridor 3 and Corridor 5 of Phase 2 of the Chennai Metro Project Chennai Metro Rail Limited (CMRL) has handed over the Letter of Acceptance (LoA) for procurement of 70 driverless 3-car trainsets including maintenance to M/s. BEML Limited at a cost of ₹. 3,657.53 crores. Thiru. T. Archunan, Director (Projects) of CMRL, handed over the Letter of Acceptance to Thiru. Rajeev Kumar Gupta, Director (Rail & Metro) of BEML Limited, on November 28, 2024, at MetroS, Anna Salai, Nandanam. The LoA was handed over in the presence of Thiru. A. R. Rajendran, CGM (RS & S&T)-CMRL, Thiru. R. Murali, CGM (F&A)-CMRL, Thiru. Tony Burchell, Team Leader-NKAB, Thiru.Praveen Kumar Mathpal, CGM (Head of Metro Business)-BEML, and other officials from CMRL, NKAB, and BEML The scope of work under this contract includes the “Design, Manufacture, Supply, Testing, Commissioning, Training of Personnel, and Comprehensive Maintenance for 15 years for Standard Gauge Metro Rolling Stock (Electrical Multiple Units) and Depot Machinery & Plant”. Under this contract, the first train is scheduled to be delivered to CMRL by the end of the year 2026 at the Madhavaram Depot. It will undergo rigorous testing at CMRL’s facilities for 14 months, including integration testing with other systems and service trials. The subsequent trains will be delivered between March 2027 and April 2029 and tested at the site.

    • No alternative text description for this image
  • RENAMING OF NANGANALLUR METRO STATION TO “OTA – NANGANALLUR ROAD METRO STATION” Chennai Metro Rail Limited is pleased to announce the renaming of Nanganallur Metro Station to OTA – Nanganallur Road Metro as per Government Order - G.O. Ms. No.151 dated 22.10.2024. The OTA – Nanganallur Road Metro station is part of the Blue Line of Phase-1 stretch of the CMRL project. The renaming of the station serves as a significant tribute to the Indian Army, recognizing the pivotal role of the Officers Training Academy (OTA) located near the Metro Station. The decision was taken during the 26th meeting of the High-Power Committee (HPC) for Chennai Metro rail Project for its considerations and recommendations, based on the requests made by the military authorities especially on the recent request made by the Chief of Staff, Head Quarters, Dakshin Bharat Area, Chennai. The renaming ceremony was held on November 25, 2024 (Today) in the presence of Thiru Rajesh Chaturvedi, IRSEE, Director (Systems & Operations), Chennai Metro Rail Limited and Lt. Gen. K.S. Brar, AVSM, General Officer Commanding, Dakshin Bharat Area. Lt. Gen. Michael A J Fernandez AVSM, VSM Commandant Officers Training Academy, Major General Ajay Sud Deputy Commandant & Chief Instructor Officers Training Academy along with several senior officials and staff of CMRL were present during this event. #chennaimetro #cmrl #chennai #metrorail #metroride #travel

    • No alternative text description for this image
  • CMRL wins Gold in The GEEF Global Sustainability Awards 2024 Chennai Metro Rail Limited (CMRL) has been honored with the prestigious Global Sustainability Award 2024 by the Global Energy and Environment Foundation (GEEF). CMRL received the prestigious award during the Global Sustainable Development Summit 2024 held on 8th November 2024 at JW Marriott Aerocity, New Delhi. This event was organized by the GEEF Foundation. Dr. Rajeev K. Srivastava, Chief Advisor (Environment) CMRL showed the Global Sustainability Award 2024 Presented by the Global Energy and Environment Foundation to the Managing Director of CMRL Thiru. M.A. Siddique I.A.S., and sought his blessings at CMRL Head Quarters in the presence of Director Projects of CMRL Thiru. T. Archunan, Thiru. Hari Prasad, AGM (Mechanical System), Thiru.Saravana Kumar, Manager (Environment) on November 20, 2024. This recognizes CMRL's outstanding contributions to the United National’s Sustainable Development Goals (SDGs), particularly through innovative and eco-friendly initiatives that minimize environmental impact while promoting reliable and efficient urban transportation. CMRL’s efforts include adopting renewable energy, reducing greenhouse gas emissions, conserving resources, improving air quality, and restoring ecosystems. These initiatives reflect its commitment to building a sustainable future while enhancing the travel experience for Chennai's citizens. This recognition reinforces CMRL's dedication to sustainability and its leadership in advancing environmentally responsible urban transport solutions.

    • No alternative text description for this image
  • Significant Milestone Achieved in Corridor 4 of CMRL Phase 2 project 100% piling works completed in the 8 km stretch CMRL achieved a significant milestone in the ongoing Phase 2 project. In Corridor 4 – ECV 01, between Kodambakkam Powerhouse and Porur Junction Station, 100% of the piling activities have been completed in this stretch. This 8km-long corridor consists of 5 Single Decker and 4 Double Decker Stations which requires of 2,255 piles to support the structure and transfer load to the ground. Pile foundations, a type of deep foundation, transfer structural loads to the ground at desired depths. The CMRL project team and the contractors faced several challenges, including the diversion of 24.45km of utilities and the redesign of pile layouts to protect critical infrastructure, such as a 1,200mm water line. A particularly significant accomplishment was the successful diversion of a massive 1,500mm water line without interrupting water supply. Thiru. T. Archunan, Director (Projects), CMRL, Thiru. S. Ashok Kumar, CGM (T & EC), Tmt. Rekha Prakash, CGM (P & D), Thiru. Murugamoorthy, Team Leader, (GC2-AEON) and Thiru. Jayaraman, Project Director, L&T along with senior officials of CMRL, General Consultants and Contractor were present during the occasion. #chennaimetro #metrorail

    • No alternative text description for this image
  • Chennai Metro Rail Limited received award from Autodesk in Autodesk Imagine Awards 2024 Chennai Metro Rail won the award under the Industry Disruptor category for the successful usage of the various Autodesk Software under Building Information Modeling (BIM). The award ceremony held at JW Marriott, Mumbai. BIM models were developed from LOD100 to LOD500 (As Built Asset Model) and each stage of model is being used for Design, Estimation and Construction. Most of the 3D models were developed using Autodesk software are mainly used for Visualization, Design optimization & Interface coordination. Almost 50 different contractors are working on this project, and we are collaborating through BIM360 & ACC as CDE. Autodesk Imagine Awards recognize customers & projects that exemplify the spirit of creativity, collaboration, and design. The awards are presented to exceptional contributors across the fields of architecture, engineering and construction, product design and manufacturing, media and entertainment and education excellence. #chennaimetro #chennai #cmrl #metrorail

    • No alternative text description for this image
  • View organization page for Chennai Metro Rail, graphic

    18,543 followers

    TBM Palar Breakthrough at Sterling Road Shaft Chennai Metro Rail Limited is in the process of implementing the much -anticipated Phase 2 project across Chennai City in full swing with three corridors for a total length of 116.1 km. The tunnelling work for Corridor 3, which runs from Chetpet to Sterling Road, commenced in September 2023 using two Tunnel Boring Machines (TBMs) named Siruvani and Palar. TBM Siruvani successfully reached the Sterling Road shaft in the Downline in August 2024. Meanwhile, TBM Palar, which began its tunnel drive in January 2024 from the Chetpet shaft in the Upline, completed its journey and broke through to the Sterling Road shaft on October 9, 2024. Each tunnel stretches 708 meters in length. The tunnelling process encountered primarily clay and sand, along with sections of Grade V rock. Notably, the TBMs navigated beneath significant landmarks, including the Chetpet Corporation School, Chetpet Dhoby Ghat, KarukathammanTemple, and various shops along Valluvar Kottam High Road, all without causing any ground settlement. Many residents remained unaware of the TBM operations occurring beneath their structures, underscoring the precision of the work. A particularly challenging segment involved crossing beneath the CoovamRiver, spanning 52 meters with only 6 meters of overburden in clay above the tunnel. This delicate operation was executed flawlessly, maintaining face pressure and alignment without any blowouts. In total, the tunnelling drive took 260 days to complete, marking a significant achievement in the ongoing development of Chennai's metro network. Thiru. Har Sahay Meena, I.A.S., Principal Secretary to Government, Special Initiatives Department, along with Thiru. T. Archunan, Director (Projects), CMRL,Tmt. Koneru Bhavani, Executive Vice President and Head Urban Transit SBG, Larsen & Toubro Ltd. and senior officials and staff of CMRL and contractors were present during the occasion. #chennaimetro #metrorail #chennai #cmrl

    • No alternative text description for this image
  • View organization page for Chennai Metro Rail, graphic

    18,543 followers

    Manufacturing Completion of First Trainset for CMRL Phase-2 project at Alstom Transport India Limited, Sricity Chennai Metro Rail Limited has awarded the Contract ARE-03A for supply of 36 numbers of Driverless (UTO Unattended Train Operation) trainsets of 3-car formation each (108 cars) for its phase-2 project on for a value of INR 1215.92 Crore including taxes and duties to M/s. Alstom Transport India Limited. The scope of the contract includes supply of driverless trains including the design, manufacture, testing, commissioning of standard gauge metro rolling stock,training of personnel, supply of spare parts and defect liability for 24 months. Manufacturing of the car body for the first train commenced on 8th February 2024 at the manufacturer's premises, i.e., Alstom Transport India Limited, Sricity, Andhra Pradesh State. The production has started with manufacturing of the car body, followed by mounting/fitment of various equipment to the car body. The above manufacturing has been completed for the first trainset of the series. The ceremonial transfer of the first trainset to the Testing Bay took place at 10.00 am on Sunday, 22nd September 2024, in the presence of Thiru Har Sahay Meena, I.A.S, Principal Secretary of the Special Initiatives Department, Government of Tamil Nadu and Thiru. Rajesh Chaturvedi, Director (Systems and Operations) of Chennai Metro Rail Ltd, Thiru A.R. Rajendran, CGM (RS and S&T) of Chennai Metro Rail Ltd, Thiru Anilkumar Saini, Managing Director Rolling Stock at Alstom, along with other senior officials and staff from Chennai Metro Rail Ltd, General Consultant to CMRL and Alstom Transport India Ltd. The event marks the completion of production of the first train set. The event is also to mark the start of testing of the train at the place of manufacturing. Upon completion of all static testing at the manufacturer's premises, the train will be delivered to the Poonamalle Depot, as soon as it is completed. It will then undergo various static and dynamic trials within the Phase-2 network tracks, followed by statutory safety verifications, approvals so as to commence passenger revenue operations.

    • No alternative text description for this image

Similar pages

Browse jobs