Filters
Results 1 - 10 of 171
Results 1 - 10 of 171.
Search took: 0.042 seconds
Sort by: date | relevance |
AbstractAbstract
No abstract available
Primary Subject
Record Type
Journal Article
Journal
Elec. Light Power, E/G Ed; v. 51(17); p. 52-54
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] The history and the evolution of the Ardennes power station are considered
[fr]
On retrace l'histoire de Chooz et considere l'evolution de la centrale des ArdennesOriginal Title
L'exemple de Chooz
Primary Subject
Record Type
Journal Article
Journal
Revue Generale Nucleaire; (no.4); p. 308-310
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] At the beginning of the year 1975 the nominal power of the nuclear plant of the Ardennes was brought from 950 up to 1040 MWth, after a positive decision of the official safety organizations. Net energy produced: 2016 GWh, number of coupled hours: 6832 h, coefficient of availability: 75%, total number of standstills: 25. The functioning of the installations is, on the whole, very satisfying. Liquid wastes are clearly inferior to admissible maximum limits. The cost per KWh of the plant amounts to 5.57 French centimes. For the last 5 years net production has reached 9375 GWh, which means an average coefficient of availability of 76.7%
Original Title
Centrale nucleaire ds Ardennes. Rapport annuel 1975
Primary Subject
Source
May 1977; 36 p
Record Type
Report
Literature Type
Progress Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
No abstract available
Primary Subject
Secondary Subject
Source
European nuclear conference; Paris, France; 21 Apr 1975; Published in summary form only.
Record Type
Journal Article
Literature Type
Conference
Journal
Transactions of the American Nuclear Society; v. 20 p. 151-152
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
Goodman, M. C.
Argonne National Laboratory (United States). High Energy Physics Div. Funding organisation: USDOE Office of Science (United States)2005
Argonne National Laboratory (United States). High Energy Physics Div. Funding organisation: USDOE Office of Science (United States)2005
AbstractAbstract
[en] A new neutrino experiment is planned at the Chooz reactor in France using two detectors to measure the parameter θ13. Two important potential backgrounds are fast neutrons from muons hitting outside the fiducial volume, and muon induced spallation of 9 Li within the fiducial volume
Primary Subject
Source
1 Jan 2005; 4 p; ICRC 2005: 29. International Cosmic Ray Conference; Pune (India); 3-10 Aug 2005; AC02-06CH11357; Available from Proc. Vol. 9, pp. 315-318; Argonne National Laboratory, Argonne, IL (US)
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] The Ardennes nuclear power station suffered two serious production setbacks in 1976 in spite of the satisfactory behavior of the equipment. The first is due to exceptionally unfavorable temperature and flow-rate conditions of the river Meuse, which caused a loss of production of about 300 million kWh. The second arises from the application of the Service des Mines regulations (decree of February 26th 1974) which in 1976 entailed the thorough inspection of the primary circuit and the ten-yearly hydraulic trial during the routine shutdown. This shutdown, intended for three months, in fact lasted an extra two weeks. Calculating the immobilization necessary for a general revision of the material, the production loss ascribable to statutory inspection may also estimated to 300 GWh. The net energy produced was 1362 GWh, the number of hours connected 5536h, the availability coefficient in time 62%, the total number of shutdowns 14. The equipment as a whole works very well. The tests carried out on the occasion of the ten-yearly trial showed the state of the main circuit to be perfectly satisfactoy, while inspections during the hydraulic trial at 207 bar revealed no anomalies. Where the behavior of the steam generators is concerned, only 20 tubes over a total of 6500 have been obstructed since the unit was started up in 1967. The cost per kWh electric of the station is 8.82 French centimes
Original Title
Centrale nucleaire des Ardennes - Rapport annuel 1976
Primary Subject
Source
1978; 62 p
Record Type
Report
Literature Type
Progress Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
Bertron, L.
Nuclex 72. International Nuclear Industries Fair, 16-21 October 1972, Basel/Switzerland1972
Nuclex 72. International Nuclear Industries Fair, 16-21 October 1972, Basel/Switzerland1972
AbstractAbstract
No abstract available
Original Title
Performances de la centrale nucleaire des Ardennes
Primary Subject
Source
Anon; Paper 2, 7 p; 1972; Nuclex 72; Basel, Switzerland; 16 Oct 1972; 4 tabs.
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
No abstract available
Original Title
Centrale nucleaire des Ardennes
Primary Subject
Source
May 1973; 42 p; 9 figs.
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
Dupont, C.; Nimal, J.C.
CEA Centre d'Etudes Nucleaires de Saclay, 91 - Gif-sur-Yvette (France)1984
CEA Centre d'Etudes Nucleaires de Saclay, 91 - Gif-sur-Yvette (France)1984
AbstractAbstract
No abstract available
Original Title
Contribution DEMT/SERMA/LEPF au congres de dosimetrie; neutron spectra of the Chooz reactor
Primary Subject
Source
1984; 3 p; Congress on dosimetry; Geesthacht (Germany, F.R.); 24-28 Sep 1984; Published in summary form only.
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
Romain, J.L.
Nuclear energy maturity. Communications of the I. European nuclear conference. Paris, 21-25 April 19751975
Nuclear energy maturity. Communications of the I. European nuclear conference. Paris, 21-25 April 19751975
AbstractAbstract
[en] The SENA (Societe d'Exploitation Nucleaire des Ardennes) has decided to load two plutonium assemblies at the beginning of the 6th cycle of the CNA (Centrale Nucleaire des Ardennes). These assemblies will be loaded in September 1975 and will undergo three irradiation cycles. A general description of these two assemblies and nuclear design calculations that have been performed are presented
[fr]
La SENA (Societe d'exploitation nucleaire des Ardennes) a decide d'introduire, au cycle 6 de la centrale nucleaire des ardennes (CNA) deux assemblages de demonstration tout plutonium. Ces assemblages seront charges en septembre 1975 et subiront trois cycles d'irradiation. On decrit, ici, la conception nucleaire de ces deux assemblages, ainsi que la methode de calcul utiliseeOriginal Title
Assemblages de demonstration au plutonium pour le reacteur de la Centrale Nucleaire des Ardennes (CNA)
Primary Subject
Source
Lehoulier, J.; Mantega, M. (eds.); American Nuclear Society, Hinsdale, Ill.; Societe Europeenne d'Energie Nucleaire, Petit-Lancy (Switzerland); p. 147-149; 1975; Societe Francaise de l'Energie Nucleaire; Clamart, France; 1. European nuclear conference; Paris, France; 21 Apr 1975
Record Type
Book
Literature Type
Conference
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
1 | 2 | 3 | Next |