Syamsurrijal Ramdja; Ari Satmoko; Sutomo Budihardjo
Proceedings of the Scientific Meeting in Nuclear Instrumentation Engineering2010
Proceedings of the Scientific Meeting in Nuclear Instrumentation Engineering2010
AbstractAbstract
[en] It has been verified the calculation of drum and pulleys on cranes as facility the gamma irradiator ISG-500. Drum is a device for rolling steel ropes while the pulley is a circular pieces called disks, and both of which are made from metal or non-metal to transmit motion and force. It has been verified the calculation of forces on the drum, drum diameter and length, and pressuring force occurred on the drums. Likewise to the pulley, the pulley diameter calculations verification, size of disc and shaft power pulleys. From the verification results, it will be obtained whether the data drums and pulley device are safe or not safe to be used. (author)
Original Title
Verifikasi perhitungan drum dan pulley overhead travelling crane pada iradiator gamma ISG 500
Primary Subject
Source
Achmad Suntoro; Rony Djokorayono; Ferry Sujatno; Utaja (Centre for Nuclear Instrumentation Engineering, National Nuclear Energy Agency, Serpong (Indonesia)) (eds.); Center for Nuclear Instrumentation Engineering, National Nuclear Energy Agency, Serpong (Indonesia); 298 p; ISSN 1693-3346; ; Nov 2010; p. 236-242; Scientific Meeting in Nuclear Instrumentation Engineering; Pertemuan Ilmiah Rekayasa Perangkat Nuklir; Serpong (Indonesia); 30 Nov 2010; Also available from Center for Utilization of Informatics and Region Strategic Nuclear, National Nuclear Energy Agency, Puspiptek Area, Fax. 62-21-7560895, Serpong, Tangerang Selatan 15314 (ID); 6 refs.; 2 tabs.
Record Type
Miscellaneous
Literature Type
Conference
Report Number
Country of publication
LanguageLanguage
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue
Koehli, T.
Koehli Thomas, Hersiwil (Switzerland). Funding organisation: Swiss Federal Office of Energy, Berne (Switzerland)2006
Koehli Thomas, Hersiwil (Switzerland). Funding organisation: Swiss Federal Office of Energy, Berne (Switzerland)2006
AbstractAbstract
[en] This final report for the Swiss Federal Office of Energy (SFOE) discusses the experience gained with a small hydro-power installation in Derendingen, Switzerland. This unique 'micro' installation uses an archimedian screw to produce 6.8 kW of power from a head of 1.15 m and a through-flow of 800 - 1000 litres per second. Optimisation of the project is discussed as are the effects of changing water levels above and below the screw. Winter operation is described and the mounting of gratings necessary to avoid the intake of debris is discussed. Fish-passes are looked at and the effort required for maintenance is compared with that for other types of installations. An accident that occurred is analysed and the results of energy-efficiency measurements made on the installation are presented. The report is rounded off with an evaluation of the plant's performance and a review of future work to be done
Original Title
Kleinwasserkraftwerk alte Ziegelei in Derendingen. Programm Kleinwasserkraftwerke. Erfahrungs- und Schlussbericht
Primary Subject
Source
2006; 13 p; Also available from OSTI; Commercial reproduction prohibited; OSTI as DE20941198; PURL: https://www.osti.gov/servlets/purl/20941198-rbA6jq/
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue