AbstractAbstract
[en] This Order sets out the updated technical conditions for dismantling and decommissioning the Vandellos I nuclear power plant
[fr]
Cet Arrete fixe les conditions techniques, mises a jour, pour le demantelement et le declassement de la centrale nucleaire Vandellos IOriginal Title
18822 - Orden de 31 de julio de 1990 por la que se deja sin efecto, con caracter definitivo, la condicion tercera del anexo a la Orden de 29 de abril de 1982, por la que se otorgo el permiso de explotacion definitivo para la central nuclear de Vandellos I, y se fijan las condiciones en las que el explotador acometera la fase previa a su desmantelamiento y clausura, para mantener la central en parada segura y retirar el combustible del emplazamiento
Primary Subject
Source
3 Aug 1990; 4 p; Published in Boletin Oficial des Estado No. 185, pp. 22786-22789.
Record Type
Miscellaneous
Literature Type
Legislative Material
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] This article presents the activities in Vandellos I Nuclear Power Plant during its decommissioning and dismantling. The NPP initiated its production during 1972 and its decommissioning in 1989
Original Title
Proyecto de desmantelamiento y clausura de la Central Nuclear de Vandellos I. Memoria de Actividades
Primary Subject
Record Type
Journal Article
Journal
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] When Vandellos-2 was officially declared in operation (March 3, 1988), the third generation of nuclear power plants became a reality in Spain. Located in Tarragona province on the Mediterranian coast, Vandellos-2 has demonstrated the value of developing working partnership among all participants in building a country's nuclear program. Vandellos-2 was planned and built by the Asociacion Nuclear Vandellos (ANV), comprising the utilities ENDESA (72 %) and Hidroelectrica Espanola (28 %). The unit has a 2785 MWth three-loop Westinghouse PWR feeding a Westinghouse turbine-generator with a gross power of 982 MWe. To obtain a competitive nuclear cost per kWh for the completed plant, ANV has carefully controlled all aspects of the project as well as monitoring hardware and construction costs. ANV's success in keeping the project on schedule was aided by Spanish industry's 25 years of experience in nuclear construction. 2 tabs
Primary Subject
Record Type
Journal Article
Journal
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] Spain is witnessing the phase-out of a nuclear power plant. It is a unique experience in our country and therefore the dismantling work has been watched closely, not only from here but also from abroad. The Empresa Nacional de Residuos Radiactivos (ENRESA) is in charge of managring the dismantling and decommissioning work of the Vandellos-1 nuclear power plant, located in the municipally of l' Hospitalet de l'Infant (Tarragona). The work began five years ago and has been executed on schedule. The appearance of what was one of the first Spanish commercial nuclear power plants has been changed radically to leave premises suitable for any other activity. (Author)
Primary Subject
Record Type
Journal Article
Journal
Nuclear Espana (1996); ISSN 1137-2885; ; v. 237; p. 48-50
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] The full text of the agreement between Spain and the International Atomic Energy Agency for the application of safeguards relating to the Vandellos Nuclear Power Plant is presented
Primary Subject
Secondary Subject
Source
Feb 1982; 19 p; Hard copies are available in English and Spanish from IAEA Division of Publications, Distribution Unit.
Record Type
Report
Literature Type
Legislative Material
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] The Spanish Public Company for Nuclear Wastes Management (ENRESA) has elaborated a plan for the dismantling and decommissioning of the Nuclear Power Plant Vandellos-I, that suffered a critical accident in October 1989. Once the Spanish Government approved the plant dismantling according to the second level of the IAEA, ENRESA signed a protocol of agreement with the Company Electricity de France (EDF). This agreement means an interchange of experiences on plant dismantling. At the present time Vandellos I is working under mode 5; namely, reactor closed-down and fuel elements being removed, and refrigerated with air at atmospheric-pressure and residual power of less than 400 KW (Thermal)
Original Title
Desmantelamiento de Vandellos I
Primary Subject
Record Type
Journal Article
Journal
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] The fire at Vandellos nuclear power plant (1989-10-19) lasted about 5 hours and was the most dangerous accident in Spanish nuclear power industry. The course of the accident is described. The situation was got under control by experienced personnel. The radioactive substances were not released. (A.S.)
Original Title
Pozar w hiszpanskiej elektrowni jadrowej Vandellos 1
Primary Subject
Record Type
Journal Article
Journal
Bezpieczenstwo Jadrowe i Ochrona Radiologiczna; (no.2); p. 26-28
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] This article presents the HIFRENSA Site in Vandellos as the basis for a new future and explains the process developed to achieve this new reality. This includes a brief description of the site, an explanation of the analysis that has been carried out on installation reuse, and a review of the potential uses. Finally, it reflects on the strategic value of the Site that gives meaning to all the business efforts and actions undertaken by HIFRENSA to manage the future value of this asset both for the company itself and for society in general. (Author)
Primary Subject
Record Type
Journal Article
Journal
Revista de la Sociedad Nuclear Espanola; CODEN RSESEJ; v. 193; p. 43-45
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] Status and prospects of nuclear power development in Spain in the nearest future are considered. Spain is noted to be at the stage of designing the third generation of NPPs. It includes five designs: Vandellos-2 (PWR reactor of 982 MW (e) and 2785 MW (t) of Westinghouse Electric Corp), Trillo-1 (PWR reactor of 1041 MW (e) power), Valdekaballeros-1 and -2 (BWR reactors of 975 MW (e)) and Trillo-2 (PWR-KWU reactor of 1041 MW). Specifications of the Vandellos-2 NPP are presented. Licence for construction is obtained in December, 1980. Commissioning is scheduled for December. 1987
Original Title
Vandelos-2 - atomnaya ehlektrostantsiya tret'ego pokoleniya
Primary Subject
Record Type
Journal Article
Journal
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
Alvarez de Buergo, L.; Gil Enciso, R.; Herranz de Miguel, R.
International Atomic Energy Agency, Vienna (Austria)1972
International Atomic Energy Agency, Vienna (Austria)1972
AbstractAbstract
No abstract available
Original Title
Comunicacion espanola al grupo de expertos sobre experiencia y tecnicas en la reparacion de los componentes de reactores
Primary Subject
Secondary Subject
Source
1972; 18 p; Panel on experience and techniques in the repair of reactor components; Vienna, Austria; 27 Nov 1972
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue