Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.023 seconds
AbstractAbstract
[en] Of the start-up tests of ''Fugen'', the specific items are reported in the plant equipemt performance test, plant dynamic characteristic test, chemical and radiation measuring test, overall test, and start-up test. In the plant equipment performance test, 19 items were tested under nuclear heating condition and in loaded state, and it was confirmed that the results satisfied the design performance. In the plant dynamic characteristic test, 13 items were tested under power output condition, and it was confirmed that the results satisfied the design performance. The test is roughly classified into the control characteristic test of the plant control system, transient characteristic test in operation, and transient characteristic test at the time of tripping following a plant failure. Radiochemical and radiation level measuring tests were carried out to obtain the basic data for chemical and radiation management required for smooth plant operation, under atmospheric pressure, nuclear heating and power output conditions. Next, in the final loading test a 100 % electrical output, reactor-related data of about 200 points, turbine-related data of about 70 points and generator-related data of about 70 points were measured and evaluated to ensure that the plant can be safely and continuously operated. Finally, the start-up test program, implementing organization and testing process, the inspection prior to the operation, analytical prediction and data processing, independent inspection and the investigation items during stratup test are described. (Wakatsuki, Y.)
Primary Subject
Record Type
Journal Article
Journal
Doryokuro Giho; ISSN 0387-0820; ; (no.43); p. 73-101
Country of publication
CONTROL ROD DRIVES, ELECTRIC GENERATORS, FAILURES, FLOW RATE, HEAVY WATER, HELIUM, INSPECTION, JATR REACTOR, PERFORMANCE TESTING, POWER SUPPLIES, PUMPS, QUALITY CONTROL, RADIATION MONITORING, REACTOR CONTROL SYSTEMS, REACTOR COOLING SYSTEMS, REACTOR START-UP, SCRAM, STEAM TURBINES, THERMAL EXPANSION, VALVES
CONTROL, CONTROL EQUIPMENT, CONTROL SYSTEMS, COOLING SYSTEMS, ELECTRICAL EQUIPMENT, ELECTRONIC EQUIPMENT, ELEMENTS, EQUIPMENT, EXPANSION, FLOW REGULATORS, HEAVY WATER MODERATED REACTORS, HWLWR TYPE REACTORS, HYDROGEN COMPOUNDS, MONITORING, NATURAL URANIUM REACTORS, NONMETALS, OPERATION, OXYGEN COMPOUNDS, PLUTONIUM REACTORS, POWER REACTORS, PRESSURE TUBE REACTORS, RARE GASES, REACTOR COMPONENTS, REACTOR OPERATION, REACTOR SHUTDOWN, REACTORS, SHUTDOWN, TESTING, THERMAL REACTORS, TURBINES, WATER, WATER COOLED REACTORS
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue