[en] The model of the French advanced steam generator N4 is to be installed initially on the Chooz site. With a capacity approaching 1500 MW (electrical) it is a development of the current 1300 MW unit series and promises significant improvements, for example, better controllability, a steam generator with an economizer, efficient primary pumps and an advanced fuel. For operational planning which envisages commissioning in the first half of 1991, there is only little flexibility, since the project constitutes the start of a construction series. Current construction progress is good and manufacture proceeds in accordance with French regulations. (orig.)
[de]
Das Modell des weiterentwickelten franzoesischen Dampferzeugers N4 soll am Standort Chooz erstmalig eingesetzt werden. Mit einer Leistung von annaehernd 1500 MW (elektrisch) setzt er die bisherige Baulinie der 1300-MW-Bloecke fort und weist wesentliche Verbesserungen auf, zum Beispiel bessere Regelbarkeit, Dampferzeuger mit Economiser, leistungsfaehige Primaerpumpen sowie einen weiterentwickelten Brennstoff. Fuer die betriebliche Planung, die eine Inbetriebnahme inder ersten Haelfte des Jahres 1991 vorsieht, besteht nur wenig Handlungsspielraum, da das Projekt den Anfang einer Baureihe bildet. Der gegenwaertige Baufortschritt ist gut, die Herstellung erfolgt nach den franzoesischen Richtlinien. (orig.)Original Title
Das N4-DWR-Projekt in Chooz B1
Primary Subject
Source
Record Type
Journal Article
Journal
VGB Kraftwerkstechnik; ISSN 0372-5715; ; v. 65(6); p. 557-562
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue