Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.021 seconds
AbstractAbstract
[en] This is the report of the third meeting on the future plan for booster-utilizing facilities, held for three days from March 1, 1984. In this meeting, the examination on a neutron scattering experiment facility and a muon experiment facility which correspond to the performance of an accelerator, and on which the examination advanced relatively in the previous meetings, was the main theme, and this examination of the future plan became serious. The outline of the GEMINI project utilizing the proton beam from the 500 MeV booster synchrotron for the 12 GeV proton accelerator in the National Laboratory for High Energy Physics, the technical problems of GEMINI and the countermeasures are described. The booster synchrotron meson facility (BOOM) at present and the proposal to create a super-BOOM and a kaon factory are reported. The way to realize the GEMINI project is discussed. The KENS-1' project, the technical problem of KENS-2 and the present status and future prospect of neutron scattering are reported by the Neutron Scattering Subcommittee. The super-BOOM project, the themes of nuclear physics and future meson science are reported by the Meson Science Subcommittee. (Kako, I.)
Primary Subject
Secondary Subject
Source
Dec 1984; 373 p; National Lab. for High Energy Physics; Oho, Ibaraki (Japan); 3. meeting on BSF future prospects; Oho, Ibaraki (Japan); 1-3 Mar 1984; Back title: KEK Internal 84-2, BSF future prospects-III.
Record Type
Book
Literature Type
Conference
Country of publication
ACCELERATORS, ACTINIDES, BARYON REACTIONS, BOSONS, CYCLIC ACCELERATORS, ELEMENTARY PARTICLES, ELEMENTS, FERMIONS, HADRON REACTIONS, HADRONS, LEPTONS, MEASURING INSTRUMENTS, MESONS, METALS, NUCLEAR REACTIONS, NUCLEON REACTIONS, PARTICLE SOURCES, PHYSICS, PSEUDOSCALAR MESONS, RADIATION SOURCES, SPECTROMETERS, STRANGE PARTICLES
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue