Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.017 seconds
Rode, C.H.; Ferry, B.; Fowler, W.B.; Makara, J.; Norris, B.; Peterson, T.; Theilacker, J.; Walker, R.
Superconducting magnets and cryogenics: proceedings1986
Superconducting magnets and cryogenics: proceedings1986
AbstractAbstract
[en] The start-up of any large system can be broken into three phases: (1) component debug, (2) commissioning and (3) operations. The component debug phase consists of getting the rotating machinery working reliably as well as getting major subsystems operational such as coldboxes. In addition, for computer controlled systems, one must get the control software and a significant fraction of the application diagnostics operational. The 13 years of experience on R and D and operation of the 27 kW Fermilab Tevatron Cryogenic System are described
Primary Subject
Source
Dahl, P.F.; Brookhaven National Lab., Upton, NY (USA); p. 249-253; 1986; p. 249-253; International Committee for Future Accelerators workshop on superconducting magnets and cryogenics; Upton, NY (USA); 12-16 May 1986; Available from NTIS, PC A15/MF A01; 1 as DE87001456
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue