Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.032 seconds
Holmes, S.D.; Dugan, G.; Marriner, J.
Fermi National Accelerator Lab., Batavia, IL (USA)1987
Fermi National Accelerator Lab., Batavia, IL (USA)1987
AbstractAbstract
[en] We have taken the approach here of trying to understand both the feasibility and practicality of varied options for new rings at Fermilab, rather than trying to produce a single detailed design. In other words, this document is not a design report and should not be construed as such. Our perception of the potential needs for new rings (in order of priority) is as follows: Antiproton Storage and/or Recovery: A facility for storing up to 4 x 1012 antiprotons is needed. Recovery of antiprotons from the collider becomes a viable option if the luminosity is indeed dominated by emittance dilution rather than beam loss. New or Post-Booster: The goal here would be to inject into the existing Main Ring above transition. Improved performance of the Main Ring would be anticipated. New Main Ring: Advantages would include better emittance preservation, a faster cycle time for antiproton production, and the removal of interference/backgrounds at the B0 and D0 detectors. We discuss in this paper various scenarios based on one or more combinations of the above possibilities. 14 figs., 10 tabs
Primary Subject
Secondary Subject
Source
19 Oct 1987; 49 p; Available from NTIS, PC A03/MF A01; 1 as DE88002842; Portions of this document are illegible in microfiche products. Original copy available until stock is exhausted.
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue