Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.025 seconds
AbstractAbstract
[en] At the Olympic Dam copper-uranium-gold deposit in South Australia, evolution in the understanding of the controls on mineralisation coupled with the changing demands of the project have led to changes in the approach to reserve estimation. The project has moved into a phase where detailed stope mining reserves are now required as distinct from global ore reserves. To enable the selective manipulation of geological and assay information and its characterisation, a relational database has been developed. For reserve calculations themselves, initial computations were based on a system derived from that used for the Kambalda nickel orebodies. The Olympic Dam system differed mainly in the use of statistical analyses in the estimation of grade instead of the previous polygonal area of influence weighting method. Three dimensional weighting techniques are now being used for local reserve estimates
Primary Subject
Source
Australasian Inst. of Mining and Metallurgy, Parkville (Australia); 187 p; ISBN 0 949 10621 6; ; 1987; p. 99-103; Australasian Institute of Mining and Metallurgy; Parkville (Australia); Resources and reserves symposium; Sydney (Australia); Nov 1987
Record Type
Book
Literature Type
Conference
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue