Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.022 seconds
Wike, L.D.; Toole, G.L.; Specht, W.L.
Westinghouse Savannah River Co., Aiken, SC (United States). Funding organisation: USDOE, Washington, DC (United States)1992
Westinghouse Savannah River Co., Aiken, SC (United States). Funding organisation: USDOE, Washington, DC (United States)1992
AbstractAbstract
[en] The Department of Energy (DOE) has proposed the construction and operation of a Replacement Power Facility (RPF) for supplementing and replacing existing sources of steam and possibly electricity at the Savannah River Site (SRS). DOE is preparing an Environmental Impact Statement (EIS) for this project As part of the impact analysis of the proposed action, the EIS will include a detailed description of the environment where the RPF will be constructed. This description must be specific to the recommended site at SRS, which contains more than 300 square miles of land including streams, lakes, impoundments, wetlands, and upland areas. A formal site-selection process was designed and implemented to identify the preferred RPF site
Primary Subject
Secondary Subject
Source
Jun 1992; 25 p; CONTRACT AC09-89SR18035; OSTI as DE93007975; NTIS; INIS; US Govt. Printing Office Dep
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue