Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.016 seconds
AbstractAbstract
[en] The commissioning of 5 MW Low Power Reactor is introduced in three aspects, working out of the commissioning document, performance of the commissioning, and some important tested results. The commissioning results show that the measured data completely meet the requirements of design, and the reactor is operable
Primary Subject
Record Type
Journal Article
Journal
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue