Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.019 seconds
Glass, H.D.; Bertsche, K.J.; Brown, B.C.
Fermi National Accelerator Lab., Batavia, IL (United States). Funding organisation: USDOE Office of Energy Research, Washington, DC (United States)1997
Fermi National Accelerator Lab., Batavia, IL (United States). Funding organisation: USDOE Office of Energy Research, Washington, DC (United States)1997
AbstractAbstract
[en] The 8 GeV transfer line feeding protons into the new Fermilab Main Injector has been built using strontium ferrite permanent magnets. This article addresses the design and manufacture of the 67 combined function magnets; permanent horizontal and verticle bend dipoles and quadrupoles were also built. The combined function magnets were built with a mean integrated strength at midaperture of 0.56953 T-m (central field nominally 0.15 T), and a gradient of 3.23% per cm relative to the dipole strength (nominal gradient = 0.48 T/m). Thermal compensation of these bricks was effected by use of a nickel-iron alloy. The magnets were thermally cycled from 20 degrees C to 0 degrees c to condition the ferrite against irreversible thermal losses; the compensation was measured with a flipcoil and verified with a rotating harmonics coil. We present details of the magnet assembly process and also summarize the magnetic measurements
Primary Subject
Secondary Subject
Source
Jun 1997; 5 p; 17. IEEE particle accelerator conference; Vancouver (Canada); 12-16 May 1997; CONF-970503--; CONTRACT AC02-76CH03000; Also available from OSTI as DE97053474; NTIS; US Govt. Printing Office Dep
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue