Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.023 seconds
AbstractAbstract
[en] KNGR adopted independent four train safety injection system which injects water into the downcomer directly through the DVI line in order to enhance safety, economics, and operability. By the adoption of DVI, more complicate phenomena, compared to current cold leg injection plant, can be occurred in the downcomer during LBLOCA. Therefore, in this paper, the effect of ECC bypass and steam condensation during LBLOCA is evaluated. As the results, KNGR DVI design has sufficient margin although ECC bypass and steam condensation make some negative effect to core reflood
Primary Subject
Secondary Subject
Source
KAERI, Taejon (Korea, Republic of); [CD-ROM]; Oct 1999; [12 p.]; 1999 autumn meeting of the Korean Nuclear Society; Seoul (Korea, Republic of); 29-30 Oct 1999; Available from KNS, Taejon (KR); 6 refs, 7 figs, 2 tabs
Record Type
Miscellaneous
Literature Type
Conference
Country of publication
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue