Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.016 seconds
Back, B. B.; Jiang, C. L.
Argonne National Laboratory (United States). Funding organisation: USDOE Office of Science (United States)2006
Argonne National Laboratory (United States). Funding organisation: USDOE Office of Science (United States)2006
AbstractAbstract
[en] The expected radioactive ion production rate for a 200 MeV/u 400 kW driver linac using four different production methods is discussed. For each isotope the optimum method is identified and the rate is calculated based on different model assumptions, empirical observation and extrapolations. The results are compared to the rates expected for a 550 MeV proton driver machine with a beam power of 50 kW, as well as the full RIA facility with a 400 MeV/u 400 kW production linac
Primary Subject
Source
31 Dec 2006; 33 p; AC02-06CH11357; Available from http://www.ipd.anl.gov/anlpubs/2006/12/57923.pdf; PURL: https://www.osti.gov/servlets/purl/925330-8JIPtR/; doi 10.2172/925330
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue