AbstractAbstract
[en] The work demonstrates that there are a number of methods available for cost allocation, the pros and cons of which are examined. The study investigates potential proportional and incremental methods in some depth. A recommendation in principle to use the latter methodology is given. It is concluded that a 'fair assumption' is that the potential allocation of costs for 'the RMA Leaching Hall' probably is small, in relation to the total costs, and estimated to be not more than about 175 kSEK, plus any costs associated with decommissioning/ disposal of a number of small pieces of equipment added by the current operator
Primary Subject
Source
Nov 2011; 34 p; ISSN 2000-0456; ; Also available from: http://www.stralsakerhetsmyndigheten.se/Global/Publikat; 1 fig., 1 tab.