AbstractAbstract
[en] The commissioning of 5 MW Low Power Reactor is introduced in three aspects, working out of the commissioning document, performance of the commissioning, and some important tested results. The commissioning results show that the measured data completely meet the requirements of design, and the reactor is operable
Primary Subject
Record Type
Journal Article
Journal
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] The main parameters, equipment and features of the 5 MW LPR are briefly introduced. The main feature is the utilization of discharged fuel element by HFETR. Failure detection system has been set up for monitoring of each fuel element. Neutron transmutation doping of monocrystal silicon, production of Mo-Tc isotope, and topaz irradiation are main tasks of this reactor
Primary Subject
Record Type
Journal Article
Journal
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue