Ratzmann, P.; Cooper, W.; Goloskie, D.; Kowalski, J.; Lipton, R.; Rapidis, P.; Serritella, C.
Fermi National Accelerator Laboratory, Batavia, IL (United States). Funding organisation: DOE Office of Science (United States)1997
Fermi National Accelerator Laboratory, Batavia, IL (United States). Funding organisation: DOE Office of Science (United States)1997
AbstractAbstract
[en] Two hybrids types are required to accomodate the flipping of ladders within each bulkhead layer, in order to account for the pigtail routing. Left and right versions are shown below, following the definitions laid out by Mike Matulik. These drawings are not to proper scale in the sketches below. The dimensionally correct versions of the 9 chip hybrids are stored in DCS under drawing number 3823.112-MD-317803 for the lefthanded version, and 3823.112-MD-317804 for the right handed version. Handedness of the hybrids are designated as shown in the figures and table below. There are long and short versions of both the left and the right, for four total 9 chip hdi designs. The pigtail lengths of the long and short are shown in a table in the hybrid drawings which reside in DCS. The chamfer in the hybrid corners (N side) is placed in order to enable the hybrid to be glued to the beryllium substrate, whereas the rectangular cuttout on the same side is to allow direct gluing of a temperature sensor to the substrate metal. The oblong shape on the N side of both hybrids is a 'stay-clear' region (defined in the final drawings) where pressure will be applied to the hybrid during the second stage of ladder construction.
Primary Subject
Secondary Subject
Source
18 Nov 1997; 4 p; AC02-07CH11359; Available from http://lss.fnal.gov/cgi-bin/find_paper.pl?d0-en-468.pdf.pdf; PURL: https://www.osti.gov/servlets/purl/1032128/; doi 10.2172/1032128
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
External URLExternal URL
Dyshkant, A.; Baldina, E.; Beznosko, D.; Blazey, G.; Bross, A.; Chakraborty, D.; Deering, P.; Francis, K.; Kubik, D.; Lima, J.G.; Nebel, T.; Pla-Dalmau, A.; Rykalin, V.; Schellpfeffer, J.; Serritella, C.; Zimmerman, J.; Zutshi, V.
Fermi National Accelerator Lab., Batavia, IL (United States). Funding organisation: US Department of Energy (United States)2005
Fermi National Accelerator Lab., Batavia, IL (United States). Funding organisation: US Department of Energy (United States)2005
AbstractAbstract
[en] About four hundred one meter long, 10 cm wide and 5 mm thick extruded scintillating strips were measured at four different points. The results of measurements strip responses to a radioactive source 90Sr are provided, and details of strip choice, preparation, and method of measurement are included. This work was essential for prototyping a tail catcher and muon tracker for a future international electron positron linear collider detector
Primary Subject
Secondary Subject
Source
1 Jun 2005; 6 p; AC--02-76CH03000; Available from PURL: https://www.osti.gov/servlets/purl/15020154-3ssERl/
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
Dyshkant, A.; Beznosko, D.; Blazey, G.; Chakraborty, D.; Francis, K.; Kubik, D.; Lima, J.G.; Rykalin, V.; Zutshi, v.; Northern Illinois U.; Baldina, E.; Bross, A.; Deering, P.; Nebel, T.; Pla-Dalmau, A.; Schellpfeffer, J.; Serritella, C.; Zimmerman, J.; Fermilab
Fermi National Accelerator Lab., Batavia, IL (United States). Funding organisation: US Department of Energy (United States)2005
Fermi National Accelerator Lab., Batavia, IL (United States). Funding organisation: US Department of Energy (United States)2005
AbstractAbstract
[en] The results of control measurements of extruded scintillating strip responses to a radioactive source Sr-90 are provided, and details of strip choice, preparation, and method of measurement are included. About four hundred one meter long extruded scintillating strips were measured at four different points. These results were essential for prototyping a tail catcher and muon tracker for a future international electron positron linear collider detector
Primary Subject
Secondary Subject
Source
1 Apr 2005; 15 p; AC02-76CH03000; Available from http://lss.fnal.gov/cgi-bin/find_paper.pl?pub-05-010.pdf; PURL: https://www.osti.gov/servlets/purl/15017182-yxoHsm/native/
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
External URLExternal URL