[en] The old observation system at Enguri High Dam based on tiltmeters' network (visual readings and data transfer to Tbilisi once per month) was unable to give operative, real time information on the current deformation processes in the dam body. Now an automated telemetric system is installed on the dam, which allows acquisition and transfer of data from three tiltmeter stations to Tbilisi, namely, to geodynamic laboratory of M. Nodia Institute of Geophysics. The data transmitted have a form of electronic tables, that are operatively processed and analyzed in the laboratory. (author)