Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.015 seconds
Yao, Damao M.; Luo, G.N.; Cao, L.; Zhou, Z.B.; Li, Q.; Wang, W.J.; Li, L.; Zi, P.F., E-mail: yaodm@ipp.ac.cn
Proceedings of the tenth Asia plasma and fusion association conference: book of abstracts2015
Proceedings of the tenth Asia plasma and fusion association conference: book of abstracts2015
AbstractAbstract
[en] The EAST tungsten divertor was designed and manufactured in 2012-2014 shut down. First commissioning is during EAST 2014 plasma summer operation due May to July. Some weak points exposed and brought damages on some divertor modules. Reasons were analyzed and optimization was made. Around half year spent for analysis, divertor modules structure optimized manufacturing and reconstruction. The optimized divertor operated during 2015 summer plasma operation and demonstrate optimizations are efficiency. There is no issue for tungsten divertor during operation. EAST plasma heating power increased step by step and will up to 20MW in 2015 winter campaign plasma operation and will validate tungsten divertor heat exhausting capability. (author)
Primary Subject
Source
Institute for Plasma Research, Gandhinagar (India); 330 p; 2015; p. 75; APFA-2015: 10. Asia plasma and fusion association conference; Gandhinagar (India); 14-18 Dec 2015; 3 refs.
Record Type
Book
Literature Type
Conference
Country of publication
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue