Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.025 seconds
Deem, R.; Penoyar, J.; Samanta, P.
Brookhaven National Lab., Upton, NY (United States). Funding organisation: Nuclear Regulatory Commission, Washington, DC (United States)1993
Brookhaven National Lab., Upton, NY (United States). Funding organisation: Nuclear Regulatory Commission, Washington, DC (United States)1993
AbstractAbstract
[en] This paper describes a risk-based screening analysis that was performed on the Surry nuclear power station to evaluate the adequacy of technical specifications (TS) for PWRs during shutdown periods. Of particular concern was the risk sensitivity to allowable TS configurations while at reduced reactor coolant system inventory conditions since incidents have occurred in plants over recent years during this time. A typical refueling outage was analyzed to determine the plant configurations created due to surveillance testing and maintenance activities. The impact from single and multiple component outages were identified so their risk influence on the plant configuration could be assessed. From these results, generic insights into the efficiency of existing TS to control high risk configurations were obtained as well as the applicability and ability of the risk-based methodology employed to make that determination
Primary Subject
Source
1993; 11 p; 16. biennial conference on reactor operating experience; Upton, NY (United States); 16-18 Aug 1993; CONF-930807--2; CONTRACT AC02-76CH00016; OSTI as DE93015784; NTIS; INIS; US Govt. Printing Office Dep
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue