Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.02 seconds
AbstractAbstract
[en] A standard method for calculating the total capital cost and the cost of electricity for a typical inertial confinement fusion electric power plant has been developed. A standard code of accounts at the two-digit level is given for the factors making up the total capital cost of the power plant. Equations are given for calculating the indirect capital costs, the project contingency, and the time-related costs. Expressions for calculating the fixed charge rate, which is necessary to determine the cost of electricity, are also described. Default parameters are given to define a reference case for comparative economic analyses
Primary Subject
Source
30 May 1986; 18 p; American Nuclear Society annual meeting; Reno, NV (USA); 15-20 Jun 1986; CONF-860610--28; Available from NTIS, PC A02/MF A01 as DE86012356
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue