Analysis of Chinshan Unit 1 full load rejection transient using RETRAN
AbstractAbstract
[en] This paper presents analysis of full power generator load rejection transient initiated in start-up test at Chinshan Nuclear Power Plant unit 1 (BWR) of Taiwan Power Company. This is a beginning of a series of analysis work planned for both BWR and PWR units. The purpose of this analysis is to evaluate the RETRAN code capability. Application to safety analysis and operations is the goal
Primary Subject
Source
Agee, L.J. (ed.); Electric Power Research Inst., Palo Alto, CA (USA); p. 18.1-18.11; Apr 1981; p. 18.1-18.11; 1. international RETRAN conference; Seattle, WA, USA; 22 - 24 Sep 1980
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Descriptors (DEI)
Descriptors (DEC)
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue