Bleed and feed studies to assess the development of emergency operating procedures for VVER-type reactors
AbstractAbstract
[en] At present, no systematic accident management has been implemented in Paks NPP of VVER-440/213-type nuclear power plant. However, results of the safety reassessment of the Paks NPP showed that one group of the measures to enhance the safety is the modernization of emergency operating procedures, including the implementation of accident management. Report is based on experimental results obtained on the PMK-2, an integral-type facility of the Paks NPP. The purpose is to study the application of secondary and primary side bleed and feed procedures to prevent the core damage for beyond DBA accident sequences. Report contains items as: assessment of the effectiveness of the operator interventions; performing accident management analyses for the PMK-2 facility; experimental results on the accident scenarios selected; computer code verification; assessment of the applied procedures
Primary Subject
Source
Rao, A.S. (ed.) (General Electric Nuclear Engineering, San Jose, CA (United States)); Duffey, R.B. (ed.) (Brookhaven National Lab., Upton, NY (United States)); Elias, D. (ed.) (Commonwealth Edison, Downers Grove, IL (United States)); 595 p; ISBN 0-7918-1226-X; ; 1996; p. 511-516; American Society of Mechanical Engineers; New York, NY (United States); ICONE 4: ASME/JSME international conference on nuclear engineering; New Orleans, LA (United States); 10-13 Mar 1996; American Society of Mechanical Engineers, United Engineering Center, 345 East 47th Street, New York, NY 10017 (United States) $250.00 for the 5-volume set
Record Type
Book
Literature Type
Conference
Country of publication
Descriptors (DEI)
Descriptors (DEC)
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue