AbstractAbstract
[en] The Nuclear Regulatory Commission's (NRC) guidance, NUREG-1407, on performing Individual Plant Examinations for External Events (IPEEE) allows a Seismic Margins Assessment (SMA) to address the IPEEE seismic issue regarding the survivability of plant equipment during a seismic event and the capability of the plant to safely shutdown following the seismic event. The NRC guidance further allows the use of the NRC SMA approach or the Electric Power Research (EPRI) approach to evaluate these issues. In addition, the NRC's Unresolved Safety Issue A-46 (USI A-46) can also be efficiently addressed with the EPRI SMA evaluation. These methodologies are useful in determining a minimum list of equipment required for safe shutdown (i.e., Safe Shutdown Equipment Lists). The resultant Safe Shutdown Equipment List, SSEL, is used to identify the electrically powered equipment required for safe shutdown for which a relay evaluation is required. The evaluation of relays associated with safe shutdown equipment is necessary since equipment can fail to operate properly due to mechanical failure or improper operation/actuation due to relay failure. SAIC has performed relay evaluations on five nuclear power plants. This paper is intended to summarize the practical insights and lessons learned from use of the EPRI SMA approach
Primary Subject
Source
Saleem, M.A. (ed.) (AECL, Mississauga, Ontario (Canada)); Aggarwal, M.C. (ed.); 372 p; ISBN 0-7918-1787-3; ; 1996; p. 293-297; American Society of Mechanical Engineers; New York, NY (United States); American Society of Mechanical Engineers (ASME) pressure vessels and piping conference; Montreal (Canada); 21-26 Jul 1996; American Society of Mechanical Engineers, United Engineering Center, 345 East 47th Street, New York, NY 10017 (United States) $60.00
Record Type
Book
Literature Type
Conference
Country of publication
Descriptors (DEI)
Descriptors (DEC)
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue