AbstractAbstract
[en] The author establishes specific requirements for heap construction by blasting on the basis of the mechanism for in situ leaching of blasted ore, analyses the feasibility of heap construction by long hole blasting, selection of the blast plan and the relevant technological problems, and gives a case of heap construction by long hole blasting in Renhua uranium mine
Primary Subject
Record Type
Journal Article
Journal
Uranium Mining and Metallurgy; ISSN 1000-8063; ; v. 18(1); p. 9-13
Country of publication
Descriptors (DEI)
Descriptors (DEC)
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue