Experience feed back of nuclear island design schedule construction and management in EPR project
AbstractAbstract
[en] In the EPR project construction progress, with method of observing schedule system part by part, then as a whole, compare the EPR schedule management methods with CPR1000. Especially focus on EPR nuclear island design schedule construction method-First construction schedules divided, then establish links with different project schedule as a whole. And compare EPR NI design schedule with CPR1000 in EPS, WBS and so on, at the same time also explaining the important function of interface project which between upstream schedule and downstream schedule. Present civil work, system and layout design schedule construction ways of nuclear island, and discuss about the time arrangement of these milestones, to achieve the target of experience feed back. (authors)
Primary Subject
Source
Chinese Nuclear Society, Beijing (China); 460 p; ISBN 978-7-5022-5040-9; ; Nov 2010; p. 346-350; '09: academic annual meeting of China Nuclear Society; Beijing (China); 18-20 Nov 2009; 1 fig., 1 tab., 2 refs.
Record Type
Book
Literature Type
Conference
Country of publication
Descriptors (DEI)
Descriptors (DEC)
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue