Characterization Problem (Troubleshooting) for IR219 Irradiator, JS10000 in Mintec-SINAGAMA: The Partnership
AbstractAbstract
[en] Control of the fuel-efficient plant operations are key to gamma irradiation service in MINTec-Sinagama. Without an efficient operation, irradiation services will be disrupted and lead to customer product failed to be completed in a set time. Additionally, downtime each time operation is also important to monitor to ensure that the fuel-efficient plant exceeded 85% in each month. In this paper MINTec plant operations data collection-Sinagama made during the year 2011-2015. Analysis carried out against downtime, the extent of damage and the action according to the classification of plant problems. This data collection is important for pattern characterization solution that can be made to the irradiator IR219, JS10000 in MINTec-Sinagama. (author)
Primary Subject
Source
2015; 1 p; NTC 2015: Nuclear Technical Convention 2015; Bangi (Malaysia); 3-5 Nov 2015; Available in abstract form only, full text entered in this record; Poster presentation
Record Type
Miscellaneous
Literature Type
Conference
Country of publication
Descriptors (DEI)
Descriptors (DEC)
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue