AbstractAbstract
[en] There is plenty of embedment for the electric cabinet in AP1000 PWR nuclear power plant. The embedment is cast-in-place, and the length of embedment is longer as compared with the width and thickness, with high installation accuracy, which is hard to meet the specific tolerance when transport and install the embedment. In order to install the electric cabinet smoothly and achieve the milestone of initial-energization, the control measure for the embedment from fabrication to installation is taken to make sure the installation accuracy. (author)
Primary Subject
Source
7 figs., 3 refs.
Record Type
Journal Article
Journal
China Nuclear Power; ISSN 1674-1617; ; v. 9(4); p. 323-328
Country of publication
Descriptors (DEI)
Descriptors (DEC)
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue