fbpx
ConstructionPlacements
Planning Engineer Job Online Test
Interview Questions and AnswersPractice Tests

Planning Engineer Interview Questions – Free Online Practice Test

Disclosure: Bear in mind that some of the links in this post are affiliate links and if you go through them to make a purchase we will earn a commission. Keep in mind that we link these companies and their products because of their quality and not because of the commission we receive from your purchases. The decision is yours, and whether or not you decide to buy something is completely up to you.

Last Updated on March 17, 2024 by Admin

Practice the below online practice test for Planning Engineer Job and find out how much you score before you appear for your next interview and written test. Kindly check the Planning Engineer Interview Questions and take this Free Online Practice Test

Advertisements

Download: The Great Construction Career – A Career Blueprint

Take this planning engineer job online tests, get your score and learn about the basics and advanced concepts of Civil Engineering and improve your scores by practicing our Civil Engineering Interview questions and answers PDF eBook.Take the Planning Engineer interview questions mock test.

If you score less than 7 in the planning engineer interview questions online preparation test, then kindly consider improving your basic competency skill in the civil engineering subjects by preparing our eBook. Take this online Planning Engineer interview questions practice test for Planning Engineer Job.

Advertisements

Download: Effective Job Search Strategies for Engineers

Welcome to your Planning Engineer Test

Instructions:

  • This is a FREE online test
  • Total number of questions: 20
  • Time alloted: 20 minutes
  • Each question carry 1 mark, no negative marks
  • DO NOT refresh the page
  • All the best!

Which of the following is a weakness of bar chart ?

PERT technique of network analysis is mainly useful for

Which of the following is not a PERT event ?

In PERT analysis, the time estimates of activities and probability of their occurrence follow

Which of the following does not represent an activity?

Advertisements

Latest start of an activity is always

Free float is mainly used to

Free float for any activity is defined as the difference between

Critical path

A father notes that when his teenage daughter uses the telephone, she takes not less than 6 minutes for a call and som? times as much as an hour. Fifteen minutes call are more frequent than calls of any other duration. If these phone calls were an activity in PERT project, then phone calls expected duration will be

The time corresponding to minimum total project cost is

The process of incorporating changes and rescheduling or replanning is called?

Advertisements

Crash project duration is obtained by summing the

Interfering float is the difference between

A machine is purchased for Rs. 10,000,00/- and has an estimated life of 10 years. The salvage value at the end of 10 years is Rs. 1,50,000/-. The book value of the machine at the end of 5 years using general straight line method of evaluation of depreciation is

Which one of the following surfaces will give highest coefficient of traction while using crawler track tractors?

During the construction period, price variation clause in contracts caters to

In resources levelling

Sensitivity analysis is a study of

Preliminary project report for a road project must contain

Related Tests:

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept Read More

Advertisements
  翻译: