Marine Loading Arm - B0330
Emco Wheaton’s B0330 High Pressure Marine Loading arm is engineered to safely and efficiently load and unload compressed natural gas (CNG) from Floating Storage Regasification Units (FSRU).
The B0330 is the latest type of loading arm for CNG applications developed by Emco Wheaton, which incorporates elements of the very reliable B0300 and B0030 models.
Thanks to the use of high strength materials, the B0330 provides an optimized light weight design and features minimal maintenance with the ability to replace the product seals without scaffolding or dismantling the loading arm itself.
The Emco Wheaton B0330 model is compatible with a range of additional accessories: Emergency Release System (ERS), swivel joints, blowdown system, nitrogen purge system and others.
Share
The Emco Wheaton B0330 model is compatible with a range of additional accessories: Emergency Release System (ERS), swivel joints, blowdown system, nitrogen purge system and others. The Emco Wheaton B0330 marine loading arm was designed from the ground up to meet the following CNG challenges:.
The advantages over hose loading facilities are:
- High reliability
- High strength materials
- Easy handling
- Minimum maintenance – minimal maintenance and with the possibility to replace the product seals without scaffolding or dismantling the loading arm itself
- Highly engineered to customer specifications
- Swivel joint designed and tested according to OCIMF 4th edition 2019. Over 15 years of proven reliability for CNG application without any failure
High Pressure QC/DC Coupler. Emergency Release System (ERS)
The Emco Wheaton High Pressure QC/DC Couplers are designed as the main part of the Emergency Release Systems (ERS) for fast and secured procedures.
Learn More
Marine Loading - Hydraulic QC/DC Coupler
The hydraulic QC/DC coupler is used for easy connection of the marine loading arm with the ship’s manifold.
Learn More
Marine Loading Arm - B0030
Includes a rigid link pantograph balancing system with independent counterweights directly linked to the inboard and outboard arm. This ensures accurate balance throughout all maneuvering and connecting positions.
Learn More
Position Monitoring System (PMS)
Our Position Monitoring System (PMS) is used to display the position of the marine loading arm within its defined operating envelope. The display uses a standard industry PC and is a live feed of the actual position of the marine loading arm.
Learn More
Marine Loading Arm - B0300
Designed for any application where it is essential to keep the product pipe consistently the same size for either economical or technical reasons, e.g. cryogenic products down to -168 °C, piggable systems and PTFE-lining.
Learn More
Marine Loading Arms
We design and manufacture a wide range of Marine Loading Arms to load and unload almost any liquid and compressed gas product from river barges, ships and ocean going super tankers.
Learn More
Features
The Emco Wheaton B0330 model is compatible with a range of additional accessories: Emergency Release System (ERS), swivel joints, blowdown system, nitrogen purge system and others. The Emco Wheaton B0330 marine loading arm was designed from the ground up to meet the following CNG challenges:.
The advantages over hose loading facilities are:
- High reliability
- High strength materials
- Easy handling
- Minimum maintenance – minimal maintenance and with the possibility to replace the product seals without scaffolding or dismantling the loading arm itself
- Highly engineered to customer specifications
- Swivel joint designed and tested according to OCIMF 4th edition 2019. Over 15 years of proven reliability for CNG application without any failure
Related Products
High Pressure QC/DC Coupler. Emergency Release System (ERS)
The Emco Wheaton High Pressure QC/DC Couplers are designed as the main part of the Emergency Release Systems (ERS) for fast and secured procedures.
Learn More
Marine Loading - Hydraulic QC/DC Coupler
The hydraulic QC/DC coupler is used for easy connection of the marine loading arm with the ship’s manifold.
Learn More
Marine Loading Arm - B0030
Includes a rigid link pantograph balancing system with independent counterweights directly linked to the inboard and outboard arm. This ensures accurate balance throughout all maneuvering and connecting positions.
Learn More
Position Monitoring System (PMS)
Our Position Monitoring System (PMS) is used to display the position of the marine loading arm within its defined operating envelope. The display uses a standard industry PC and is a live feed of the actual position of the marine loading arm.
Learn More
Marine Loading Arm - B0300
Designed for any application where it is essential to keep the product pipe consistently the same size for either economical or technical reasons, e.g. cryogenic products down to -168 °C, piggable systems and PTFE-lining.
Learn More
Marine Loading Arms
We design and manufacture a wide range of Marine Loading Arms to load and unload almost any liquid and compressed gas product from river barges, ships and ocean going super tankers.
Learn More