High Pressure Compressed Natural Gas (CNG) Marine Loading Arms
Compressed Natural Gas (CNG) industry is gathering strong momentum. In recent years, the natural gas demand has drastically increased globally with the rise in eco-friendly legislation. The CNG expected growth comes with challenges that include having a reliable partner in loading solutions that provides a safe and efficient solution. With the actual global energy and CNG demand, Emco Wheaton High Pressure Marine Loading Arm can significantly contribute to your gas supply security.
Emco Wheaton High Pressure Natural Gas Marine Loading Arms are highly engineered to meet the unique and most demanding customer requirements.
A-Frame Bottom Loader
The "A" Frame Bottom Loader offers the advantages of easy handling, long reach and quality Emco Wheaton technology.
Learn More
Bottom Hose Loaders
The Bottom Hose Loading Arm is designed specifically to use multiple arms together as a Bottom Hose Loading Station for bottom filling of multiple compartment tank trucks.
Learn More
High Pressure Marine Loading Arm - B0330
Emco Wheaton’s B0330 High Pressure Marine Loading arm is engineered to safely and efficiently load and unload compressed natural gas (CNG) from Floating Storage Regasification Units (FSRU).
Learn More
Marine Loading Arms
We design and manufacture a wide range of Marine Loading Arms to load and unload almost any liquid and compressed gas product from river barges, ships and ocean going super tankers.
Learn More
High Pressure Marine Loading Arm - B0330
Emco Wheaton’s B0330 High Pressure Marine Loading arm is engineered to safely and efficiently load and unload compressed natural gas (CNG) from Floating Storage Regasification Units (FSRU).
Learn More
High Pressure Marine Loading Arm - B0300
The B0300 Emco Wheaton’s marine loading arm design has proven its reliability for more than 15 years for CNG applications.
Learn More
High Pressure QC/DC Coupler. Emergency Release System (ERS)
The Emco Wheaton High Pressure QC/DC Couplers are designed as the main part of the Emergency Release Systems (ERS) for fast and secured procedures.
Learn More
SURELOK Couplings
Represent the most innovative method of producing fast and tight connection between two hoses or a vessel and a hose. These couplings comply with the safety requirements of the chemical and oil industries.
Learn More
Hydraulic
Our Hydraulic Quick Release System E0790 is used for the automatic separation of a connected loading arm from a tank vehicle in the event of an accidental drive-away whilst still connected. In this event, there is minimal loss of pressure in the rest of the connected supply.
Learn More
Overfill Safety Device
Secondary safety system which prevents product overflow, for example in the case of an incorrect pre-selected loading amount.
Learn More
Telescopic Drop Tube
is used with a bottom contact switch, ensuring that the drop tube is permanently in touch with the bottom of the tanker being loaded. Our telescopic drop tubes can be either manually or pneumatically operated. Manually operated telescopic drop tubes are robust and have a short installation.
Learn More
Heating Systems
Designed to keep loaded fluids in a liquid state, used for products with low and middle temperature ranges or if there is no other heating media available.
Learn More
Hose Release System
Our Hose Release System is used for the protection of loading hoses during loading/unloading of barges, providing environmentally safe handling of loading hoses.
Learn More
Vapor Cones and Plates
Adding a vapor cone or plate with a vapor recovery system on the arm, this improves the profitability of the terminal because vaporized product can be recovered and does not pollute the environment.
Learn More
Parallel Device for Bottom Loading Arms
The arm is fitted with six swivels for complete 3-axis movement of the tanker connection, allowing for tanker height changes during filling/discharge. The arm is additionally fitted with a parallel bar that holds the tanker connection arm ("B"-length) in a horizontal position irrespective of the primary arm ("A"-length) position. This makes tanker connection and disconnection much easier. The B-length also has a gas spring fitted allowing the operator to raise and lower the B-length with total ease.
Learn More
Pneumatic
Our pneumatic Quick Release System provides automatic disconnection of a loading arm in the event of a tanker accidentally driving away whilst simultaneously shutting off the product flow both upstream and downstream of the disconnection point.
Learn More
Mechanical
Our mechanical Quick Release System provides automatic disconnection of a loading arm in the event of a tanker accidentally driving away. Simultaneously the product flow will be shut off both upstream and downstream of the disconnection point.
Learn More
- Wide experience - With the biggest installed base of the world's CNG applications, Emco Wheaton is today’s market-leading manufacturer of High Pressure Compressed Natural Gas (CNG) Marine Loading Arms. CNG is gathering strong momentum and Emco Wheaton is fully prepared to provide transfer solutions for the growing demand of this natural gas.
- Maximum safety - The safety and integrity of our customer’s operations are our top priority. Our High Pressure Marine Loading Arms are designed to operate within a dedicated working envelope. The system can automatically disconnect in a safe manner to avoid damage in case of an abnormal or accidental situation (sudden storm, failure of mooring system or effects of a passing-by ship). This safety function is provided by a system called the Emergency Release System (ERS).
- Engineered to Order - We understand that each customer is unique, and that each operation has a specific set of needs and challenges. That is why we partner with our customers, working closely with them to deliver a solution that is tailored to meet their specific demands; regardless of the industry or application.
Standards and Certificates - Our high pressure marine loading arms are designed to meet the OCIMF 2019 as well as EC Directives (ATEX, PED). - Easy Installations - Our high pressure marine loading arms are designed for ease of installation with the assistance of a crane.
Minimum maintenance - Emco Wheaton high pressure marine loading arms require minimal maintenance and all product seals can be replaced without scaffolding or dismantling the loading arm itself. - Reliable - Built with legendary quality and reliability, Emco Wheaton loading arms are connected almost permanently to the FSRU. We use the best materials and components to ensure a high level of corrosion resistance and safe operation.
Other accessories: | Availability of different seal materials: |
|
|
With more than 100 years’ experience working in the fluid transfer industry, Emco Wheaton was the first company to develop a High-Pressure Natural Gas marine loading arm. Initially designed and manufactured in Kirchhain, Germany in 2005, the company’s engineered high pressure marine loading arms have undergone continuous development and testing. Emco Wheaton is today the market leading manufacturer of High Pressure Compressed Natural Gas (CNG) Marine Loading Arms with the biggest installed based among its competitors.
CUSTOM SOLUTIONS
Emco Wheaton Marine Loading Arms are highly engineered to meet customer technical requirements. We work closely with our customers to deliver a solution that is tailored to meet their specific demands.
PROJECT MANAGEMENT SUPPORT
Thanks to our impressive experience of completed High Pressure Natural Gas (CNG) Marine Loading Arm projects, we know how to help our clients proceed smoothly through the entire process. Our engineering team provides full project management support from conceptual design to construction, commissioning and aftermarket support.
Our engineer project managers deliver on time and work to exceed technical support expectations during all project phases including technical and quality management, including complete documentation support.
TURN-KEY INSTALLATION, COMMISSIONING AND TRAINING
The correct installation is essential in providing long-term marine loading arms safety and reliability. Emco Wheaton provides full turnkey solutions from initial site surveys through to design installation and final commissioning. Our expert engineers evaluate all critical factors such as location, environmental conditions, safety requirements to ensure the complete marine loading arm installation works in the most demanding conditions.
Marine Loading Arms
A-Frame Bottom Loader
The "A" Frame Bottom Loader offers the advantages of easy handling, long reach and quality Emco Wheaton technology.
Learn More
Bottom Hose Loaders
The Bottom Hose Loading Arm is designed specifically to use multiple arms together as a Bottom Hose Loading Station for bottom filling of multiple compartment tank trucks.
Learn More
High Pressure Marine Loading Arm - B0330
Emco Wheaton’s B0330 High Pressure Marine Loading arm is engineered to safely and efficiently load and unload compressed natural gas (CNG) from Floating Storage Regasification Units (FSRU).
Learn More
Marine Loading Arms
We design and manufacture a wide range of Marine Loading Arms to load and unload almost any liquid and compressed gas product from river barges, ships and ocean going super tankers.
Learn More
High Pressure Marine Loading Arm - B0330
Emco Wheaton’s B0330 High Pressure Marine Loading arm is engineered to safely and efficiently load and unload compressed natural gas (CNG) from Floating Storage Regasification Units (FSRU).
Learn More
High Pressure Marine Loading Arm - B0300
The B0300 Emco Wheaton’s marine loading arm design has proven its reliability for more than 15 years for CNG applications.
Learn More
High Pressure QC/DC Coupler. Emergency Release System (ERS)
The Emco Wheaton High Pressure QC/DC Couplers are designed as the main part of the Emergency Release Systems (ERS) for fast and secured procedures.
Learn More
Benefits
SURELOK Couplings
Represent the most innovative method of producing fast and tight connection between two hoses or a vessel and a hose. These couplings comply with the safety requirements of the chemical and oil industries.
Learn More
Hydraulic
Our Hydraulic Quick Release System E0790 is used for the automatic separation of a connected loading arm from a tank vehicle in the event of an accidental drive-away whilst still connected. In this event, there is minimal loss of pressure in the rest of the connected supply.
Learn More
Overfill Safety Device
Secondary safety system which prevents product overflow, for example in the case of an incorrect pre-selected loading amount.
Learn More
Telescopic Drop Tube
is used with a bottom contact switch, ensuring that the drop tube is permanently in touch with the bottom of the tanker being loaded. Our telescopic drop tubes can be either manually or pneumatically operated. Manually operated telescopic drop tubes are robust and have a short installation.
Learn More
Heating Systems
Designed to keep loaded fluids in a liquid state, used for products with low and middle temperature ranges or if there is no other heating media available.
Learn More
Hose Release System
Our Hose Release System is used for the protection of loading hoses during loading/unloading of barges, providing environmentally safe handling of loading hoses.
Learn More
Vapor Cones and Plates
Adding a vapor cone or plate with a vapor recovery system on the arm, this improves the profitability of the terminal because vaporized product can be recovered and does not pollute the environment.
Learn More
Parallel Device for Bottom Loading Arms
The arm is fitted with six swivels for complete 3-axis movement of the tanker connection, allowing for tanker height changes during filling/discharge. The arm is additionally fitted with a parallel bar that holds the tanker connection arm ("B"-length) in a horizontal position irrespective of the primary arm ("A"-length) position. This makes tanker connection and disconnection much easier. The B-length also has a gas spring fitted allowing the operator to raise and lower the B-length with total ease.
Learn More
Pneumatic
Our pneumatic Quick Release System provides automatic disconnection of a loading arm in the event of a tanker accidentally driving away whilst simultaneously shutting off the product flow both upstream and downstream of the disconnection point.
Learn More
Mechanical
Our mechanical Quick Release System provides automatic disconnection of a loading arm in the event of a tanker accidentally driving away. Simultaneously the product flow will be shut off both upstream and downstream of the disconnection point.
Learn More
- Wide experience - With the biggest installed base of the world's CNG applications, Emco Wheaton is today’s market-leading manufacturer of High Pressure Compressed Natural Gas (CNG) Marine Loading Arms. CNG is gathering strong momentum and Emco Wheaton is fully prepared to provide transfer solutions for the growing demand of this natural gas.
- Maximum safety - The safety and integrity of our customer’s operations are our top priority. Our High Pressure Marine Loading Arms are designed to operate within a dedicated working envelope. The system can automatically disconnect in a safe manner to avoid damage in case of an abnormal or accidental situation (sudden storm, failure of mooring system or effects of a passing-by ship). This safety function is provided by a system called the Emergency Release System (ERS).
- Engineered to Order - We understand that each customer is unique, and that each operation has a specific set of needs and challenges. That is why we partner with our customers, working closely with them to deliver a solution that is tailored to meet their specific demands; regardless of the industry or application.
Standards and Certificates - Our high pressure marine loading arms are designed to meet the OCIMF 2019 as well as EC Directives (ATEX, PED). - Easy Installations - Our high pressure marine loading arms are designed for ease of installation with the assistance of a crane.
Minimum maintenance - Emco Wheaton high pressure marine loading arms require minimal maintenance and all product seals can be replaced without scaffolding or dismantling the loading arm itself. - Reliable - Built with legendary quality and reliability, Emco Wheaton loading arms are connected almost permanently to the FSRU. We use the best materials and components to ensure a high level of corrosion resistance and safe operation.
Other accessories: | Availability of different seal materials: |
|
|
Engineered to Customer Requirements
With more than 100 years’ experience working in the fluid transfer industry, Emco Wheaton was the first company to develop a High-Pressure Natural Gas marine loading arm. Initially designed and manufactured in Kirchhain, Germany in 2005, the company’s engineered high pressure marine loading arms have undergone continuous development and testing. Emco Wheaton is today the market leading manufacturer of High Pressure Compressed Natural Gas (CNG) Marine Loading Arms with the biggest installed based among its competitors.
Trusted Leader in CNG Industry
CUSTOM SOLUTIONS
Emco Wheaton Marine Loading Arms are highly engineered to meet customer technical requirements. We work closely with our customers to deliver a solution that is tailored to meet their specific demands.
PROJECT MANAGEMENT SUPPORT
Thanks to our impressive experience of completed High Pressure Natural Gas (CNG) Marine Loading Arm projects, we know how to help our clients proceed smoothly through the entire process. Our engineering team provides full project management support from conceptual design to construction, commissioning and aftermarket support.
Our engineer project managers deliver on time and work to exceed technical support expectations during all project phases including technical and quality management, including complete documentation support.
TURN-KEY INSTALLATION, COMMISSIONING AND TRAINING
The correct installation is essential in providing long-term marine loading arms safety and reliability. Emco Wheaton provides full turnkey solutions from initial site surveys through to design installation and final commissioning. Our expert engineers evaluate all critical factors such as location, environmental conditions, safety requirements to ensure the complete marine loading arm installation works in the most demanding conditions.