https://lnkd.in/dkYYmg3T
#qatar #vision2030 #trending #viral #icorppro #GCC #electricity
The 400kV Cable Project for the North Field South (NFS) Onshore in Qatar is an exceptional electrical infrastructure development project. This project encompasses the complete design, engineering, procurement, and construction of a 400kV cable system for the NFS Onshore Project. However, the EPC contract for this project is a testament to the exceptional quality and expertise of the team involved.
During the first year, the Elsewedy Cables Qatar and Technip Energies France team initiated the project by engaging in discussions and negotiations. Moreover, detailed planning and feasibility studies were conducted to identify project requirements and scope. The parties involved finalized an agreement that outlined roles, responsibilities, and timelines, ensuring that all aspects of the project were well-defined and that the project could move forward with clarity and confidence.
In the second year, the project entered the design phase, where the engineering aspects were the main focus. The engineering team began creating the technical specifications and blueprints for the 400kV cables, ensuring the designs were precise and aligned with the project requirements. Moreover, the team worked diligently to ensure the project progressed according to the established timeline.
In the third year, the installation phase began with a focus on laying the 400kV cables between the designated substations. Quality control measures ensured that all work complied with industry standards and specifications. The team conducted regular inspections to monitor progress and promptly address any issues that arose during installation. The team worked tirelessly to ensure the project was completed on time and to the highest quality standards possible, providing the client with a reliable and efficient electrical infrastructure that would serve them well for years.
In the fourth year, the testing and commissioning phase commenced to verify the functionality and reliability of the installed cables. Also, Final adjustments were made to optimize the performance of the electrical infrastructure, ensuring that it was operating at peak efficiency. Furthermore, the project has been completed, and the client took ownership of the infrastructure for operational use.
Key Features of 400kV Cable Project for North-South Field Onshore:
The project aims to establish an electricity supply to NFS facilities.
Involves design, engineering, procurement, and installation of two 400kV cables between RLF-S and 220kV INTAKE substation.
Technip Energies France is the main EPC contractor overseeing the project.
400kV power import lines to boost Qatar’s LNG production.
Elsewedy Cables Qatar pledges to deliver high-quality products and expertise for successful project completion.