Uma árvore de Natal típica é composta de : AWV : ANNULUS WING VALVE AMV: ANNULUS MASTER VALVE PWV: PRODUCTION WING VALVE PMV: PRODUCTION MASTER VALVE DHSV: DOWNNHOLE SAFETY VALVE PXO: PIG CROSSOVER XO: CROSSOVER
André Ranzeiro’s Post
More Relevant Posts
-
Embuchamento na tampa do compressor de engrenagem . Ingoing on the cover of the gear compressor.
To view or add a comment, sign in
-
Guincho do guindaste quebrado 1° Eixo da bomba(motor hidraulico) quebrado 2° Eixo quebrado na esquerda e eixo extra na direita. 3° Removendo o eixo quebrado. 4° Instalando novo eixo no local 5° Guindaste operacional -------- Winch of the crane broke 1° pump shaft broke ( from wire rope winch) 2° The broke shaft on the left and spare part on the right. 3° Removing the shaft 4° Placed the new shaft 5° Crane Operational
To view or add a comment, sign in
-
learn about it!
Passo a Passo: Instalação da Árvore de Natal Molhada Vertical (ANM)🎄(Video 1/2) Essa é uma operação que utiliza precisão, tecnologia e auxílio de ROVs. Etapas da Instalação: 1. Assentamento da BAP: O processo começa com o posicionamento da BAP na cabeça do poço, utilizando um ROV para garantir o alinhamento correto. 2. Pressurização: O ROV pressuriza a linha de travamento do conector hidráulico com 3000 PSI, travando a BAP na cabeça do poço. 3. Teste de Vedação: A interface ST é ativada, liberando a pressão dos acumuladores, permitindo o teste do selo VGX da BAP. 4. Remoção do Jumper Hidráulico: O jumper é removido, e o ROV pressuriza a linha de destravamento, desconectando a FIBAP da BAP, permitindo a recuperação da ferramenta à superfície. 5. Instalação do BOP: O BOP é instalado para garantir segurança durante a perfuração do tampão de cimento. 6. Bucha de Desgaste: Instala-se a bucha de desgaste para proteger a integridade da BAP durante a perfuração. 7. Perfuração do Tampão: A perfuração é realizada com o BOP em posição para garantir o controle do poço. 8. Teste de Vedação do BOP: Após a perfuração, realiza-se o teste de vedação para assegurar a integridade do BOP e depois remove-se a bucha de desgaste. 9. Travamento do Suspensor de Coluna: O suspensor de coluna, que suporta a coluna de produção, é travado na BAP com 3000 PSI. 10. Instalação do Plug Wired Line: O Plug Wired Line é inserido no suspensor, garantindo o bloqueio da coluna de produção. 11. Recuperação da Ferramenta de Instalação: A ferramenta de instalação do suspensor é recuperada à superfície, e um novo teste de vedação do BOP é realizado. 12. Recuperação do BOP: Após os testes, o BOP é recuperado à superfície, finalizando a operação. Postarei na sequência outros videos com a continuidade da instalação completa da ANM, acompanhe o conteúdo 1/2. Fonte: Video Youtube | Aker solutions. #offshore #engenharia #petróleo #subsea #ROV #perfuração #ANM #oilandgas #prio #senai #reaçãooffshore
To view or add a comment, sign in
-
drilling production well completation
Passo a Passo: Instalação da Árvore de Natal Molhada Vertical (ANM)🎄(Video 1/2) Essa é uma operação que utiliza precisão, tecnologia e auxílio de ROVs. Etapas da Instalação: 1. Assentamento da BAP: O processo começa com o posicionamento da BAP na cabeça do poço, utilizando um ROV para garantir o alinhamento correto. 2. Pressurização: O ROV pressuriza a linha de travamento do conector hidráulico com 3000 PSI, travando a BAP na cabeça do poço. 3. Teste de Vedação: A interface ST é ativada, liberando a pressão dos acumuladores, permitindo o teste do selo VGX da BAP. 4. Remoção do Jumper Hidráulico: O jumper é removido, e o ROV pressuriza a linha de destravamento, desconectando a FIBAP da BAP, permitindo a recuperação da ferramenta à superfície. 5. Instalação do BOP: O BOP é instalado para garantir segurança durante a perfuração do tampão de cimento. 6. Bucha de Desgaste: Instala-se a bucha de desgaste para proteger a integridade da BAP durante a perfuração. 7. Perfuração do Tampão: A perfuração é realizada com o BOP em posição para garantir o controle do poço. 8. Teste de Vedação do BOP: Após a perfuração, realiza-se o teste de vedação para assegurar a integridade do BOP e depois remove-se a bucha de desgaste. 9. Travamento do Suspensor de Coluna: O suspensor de coluna, que suporta a coluna de produção, é travado na BAP com 3000 PSI. 10. Instalação do Plug Wired Line: O Plug Wired Line é inserido no suspensor, garantindo o bloqueio da coluna de produção. 11. Recuperação da Ferramenta de Instalação: A ferramenta de instalação do suspensor é recuperada à superfície, e um novo teste de vedação do BOP é realizado. 12. Recuperação do BOP: Após os testes, o BOP é recuperado à superfície, finalizando a operação. Postarei na sequência outros videos com a continuidade da instalação completa da ANM, acompanhe o conteúdo 1/2. Fonte: Video Youtube | Aker solutions. #offshore #engenharia #petróleo #subsea #ROV #perfuração #ANM #oilandgas #prio #senai #reaçãooffshore
To view or add a comment, sign in
-
Step by Step on how to install a XTree Enjoy it
Passo a Passo: Instalação da Árvore de Natal Molhada Vertical (ANM)🎄(Video 1/2) Essa é uma operação que utiliza precisão, tecnologia e auxílio de ROVs. Etapas da Instalação: 1. Assentamento da BAP: O processo começa com o posicionamento da BAP na cabeça do poço, utilizando um ROV para garantir o alinhamento correto. 2. Pressurização: O ROV pressuriza a linha de travamento do conector hidráulico com 3000 PSI, travando a BAP na cabeça do poço. 3. Teste de Vedação: A interface ST é ativada, liberando a pressão dos acumuladores, permitindo o teste do selo VGX da BAP. 4. Remoção do Jumper Hidráulico: O jumper é removido, e o ROV pressuriza a linha de destravamento, desconectando a FIBAP da BAP, permitindo a recuperação da ferramenta à superfície. 5. Instalação do BOP: O BOP é instalado para garantir segurança durante a perfuração do tampão de cimento. 6. Bucha de Desgaste: Instala-se a bucha de desgaste para proteger a integridade da BAP durante a perfuração. 7. Perfuração do Tampão: A perfuração é realizada com o BOP em posição para garantir o controle do poço. 8. Teste de Vedação do BOP: Após a perfuração, realiza-se o teste de vedação para assegurar a integridade do BOP e depois remove-se a bucha de desgaste. 9. Travamento do Suspensor de Coluna: O suspensor de coluna, que suporta a coluna de produção, é travado na BAP com 3000 PSI. 10. Instalação do Plug Wired Line: O Plug Wired Line é inserido no suspensor, garantindo o bloqueio da coluna de produção. 11. Recuperação da Ferramenta de Instalação: A ferramenta de instalação do suspensor é recuperada à superfície, e um novo teste de vedação do BOP é realizado. 12. Recuperação do BOP: Após os testes, o BOP é recuperado à superfície, finalizando a operação. Postarei na sequência outros videos com a continuidade da instalação completa da ANM, acompanhe o conteúdo 1/2. Fonte: Video Youtube | Aker solutions. #offshore #engenharia #petróleo #subsea #ROV #perfuração #ANM #oilandgas #prio #senai #reaçãooffshore
To view or add a comment, sign in
-
Step-by-Step Guide to a Subsea Operation to Connect the Wellhead ⚙️🚢 In this video, we show how a complex and crucial operation takes place to ensure efficient and safe production in the oil and gas sector. Check out the main steps of this operation: 1-Installation of the Tubing Head Spool (THS) using the Hydraulic CART: The THS is positioned on the wellhead. 2-The ROV orients the THS in the correct direction of the flowline and lands it on the wellhead. 3-Connection of the THS via ROV Hotstab and testing of the installation. 4-Removal of the Hydraulic CART to the surface and installation of the BOP (Blowout Preventer). 5-After the drilling phase, the Tubing Hanger is operated, with passive orientation and soft landing. 6-The Tubing Support is locked and the installation tool is removed, followed by the removal of the BOP. 7-Installation of the Christmas tree (DVXT) using the CWOR or Hydraulic CART system. 8-Connection of the umbilical and parking on the LRP plate after suspension operations. 9-The installation is completed with the placement of the Debris Cover, connection of the flow line and the production umbilical. These steps demonstrate the precision and control required for deepwater operations, where every detail is crucial to ensure well integrity and production success. Source: Youtube
🌊💧 Passo a Passo de uma Operação Submarina para Conectar a Cabeça de Poço ⚙️🚢 Neste vídeo, mostramos como ocorre uma operação complexa e crucial para garantir a produção eficiente e segura no setor de petróleo e gás. Confira os principais passos dessa operação: 1-Instalação do Tubing Head Spool (THS) com o uso do Hydraulic CART: O THS é posicionado sobre a cabeça do poço. 2-O ROV orienta o THS na direção correta da linha de fluxo e o aterrissa na cabeça do poço. 3-Conexão do THS via ROV Hotstab e teste da vedação. 4-Remoção do Hydraulic CART para a superfície e instalação do BOP (Blowout Preventer). 5-Após a fase de perfuração, é realizado o running do Tubing Hanger, com orientação passiva e aterrissagem suave. 6-O Tubing Hanger é travado e a ferramenta de instalação é removida, seguida pela remoção do BOP. 7-Instalação da árvore de natal (DVXT) usando o sistema CWOR ou Hydraulic CART. 8-Conexão do umbilical e estacionamento na placa LRP após as operações de suspensão. 9-A instalação é finalizada com a colocação do Debris Cover, conexão da linha de fluxo e do umbilical de produção. Essas etapas demonstram a precisão e o controle necessários para operações em águas profundas, onde cada detalhe é crucial para garantir a integridade do poço e o sucesso da produção. Fonte: Youtube / Aprendizado Senai. #petroleoegas #producaooffshore #inovacaotecnológica #operacaosubsea #energia #operadordeproducaooffshore #prio #oilandgas #institutoreacao #reaçãooffshore Reação Offshore PRIO
To view or add a comment, sign in
-
Crutial Oil & Gas Production Phase
🌊💧 Passo a Passo de uma Operação Submarina para Conectar a Cabeça de Poço ⚙️🚢 Neste vídeo, mostramos como ocorre uma operação complexa e crucial para garantir a produção eficiente e segura no setor de petróleo e gás. Confira os principais passos dessa operação: 1-Instalação do Tubing Head Spool (THS) com o uso do Hydraulic CART: O THS é posicionado sobre a cabeça do poço. 2-O ROV orienta o THS na direção correta da linha de fluxo e o aterrissa na cabeça do poço. 3-Conexão do THS via ROV Hotstab e teste da vedação. 4-Remoção do Hydraulic CART para a superfície e instalação do BOP (Blowout Preventer). 5-Após a fase de perfuração, é realizado o running do Tubing Hanger, com orientação passiva e aterrissagem suave. 6-O Tubing Hanger é travado e a ferramenta de instalação é removida, seguida pela remoção do BOP. 7-Instalação da árvore de natal (DVXT) usando o sistema CWOR ou Hydraulic CART. 8-Conexão do umbilical e estacionamento na placa LRP após as operações de suspensão. 9-A instalação é finalizada com a colocação do Debris Cover, conexão da linha de fluxo e do umbilical de produção. Essas etapas demonstram a precisão e o controle necessários para operações em águas profundas, onde cada detalhe é crucial para garantir a integridade do poço e o sucesso da produção. Fonte: Youtube / Aprendizado Senai. #petroleoegas #producaooffshore #inovacaotecnológica #operacaosubsea #energia #operadordeproducaooffshore #prio #oilandgas #institutoreacao #reaçãooffshore Reação Offshore PRIO
To view or add a comment, sign in
-
First OneSubsea Processing Multi Phase Pump (MPP) on its way to be installed by Sapura Onix for Enauta. More to come...
Nossas atividades rumo ao 1º óleo do FPSO Atlanta não param! A embarcação especializada Sapura Ônix deixou a Baía de Guanabara (RJ) rumo ao Campo de Atlanta, na Bacia de Santos. A embarcação do tipo PLSV (Pipe Laying Support Vessel) realizará a instalação das bombas multifásicas (MPP), dos umbilicais para transmissão de energia e de dados, e de risers de produção, conectando a infraestrutura submarina dos poços produtores ao FPSO Atlanta. Foram carregados 16,3 Km de linhas flexíveis e 12,1 Km de umbilicais, além de 170 toneladas da primeira MPP (Multi Phase Pumps), utilizadas para aumentar a pressão para escoamento do óleo do poço até o FPSO. Confira nas imagens o momento em que a embarcação inicia sua navegação para a locação. #SomosEnauta #VivemosNossaTransformação #CampodeAtlanta
To view or add a comment, sign in
-
Oil and gas world
Especialista Engenharia de Poços de Petróleo e Gás/ Graduando Eng. Mecânica/ Projetista de Animações 2D e 3D aplicado à área de petróleo/ Fundador da PETROANIMES
Vamos de animação! Perfuração de Poço Horizontal Esta animação tem como objetivo ilustrar de forma simples o processo de perfuração de um poço horizontal em terra firme, que busca alcançar um reservatório no mar. Devido à simplicidade da animação, alguns aspectos técnicos, como cimentação, perfis e fases de revestimento, não foram abordados. Esses temas serão explorados em animações futuras. Aqui está a sequência do processo de perfuração mostrada na animação: 1. Montagem dos Equipamentos de Segurança: Começamos montando os equipamentos de segurança na cabeça do poço, com destaque para o BOP (Blowout Preventer). 2. Perfuração do Poço: Iniciamos a perfuração com a coluna de perfuração, que possui uma broca na extremidade. 3. Instalação do Revestimento: Após a perfuração, removemos a coluna de perfuração e descemos o revestimento. Observação: as etapas de assentamento da sapata de revestimento, perfis e cimentação não são mostradas aqui, pois serão abordadas em animações futuras. 4. Descida da Coluna de Produção: Em seguida, descemos a coluna de produção com um packer na extremidade. Após posicionar a coluna no fundo do poço, fazemos o assentamento do packer. Observação: o packer é utilizado para isolar a área anular, que fica entre a parede externa da coluna de produção e a parede interna do revestimento de produção. 5. Finalização do Poço: Com o poço preparado, retiramos os equipamentos de segurança da superfície e instalamos a árvore de natal, o conjunto de válvulas que controla o fluxo de produção ou injeção. 6. Início da Produção: Finalmente, colocamos o poço em produção. Se você gostou do conteúdo, ajude-nos curtindo, compartilhando e deixando sua opinião falando o que você curtiu na animação. Marque também aquele amigo que tem interesse em conhecer a indústria de petróleo ou que é curioso sobre modelagens e animações industriais. Obrigado pela sua participação!
To view or add a comment, sign in