The significant document from the International Association of Oil & Gas Producers (IOGP), which provides crucial information about the incident that took place in worldwide operations, report number #24-9 on September 2024 .
Upon retrieving a lower completion, an influx was introduced into the well. The distribution of swellable packers was inconceivable. Kindly evaluate the operational failures necessitating the execution of contingency procedures throughout your assessment. Are contingency protocols established, and have you recognised and addressed your possible failures?
The management of reservoirs that are either depleted or lack natural flow seems to be affected by risk normalisation in several cases, including this occurrence. In these circumstances, well control standards are often compromised, resulting in insufficient equipment and experience to avert the escalation of a catastrophe.
You can read full article at below link at IOGP Europe website;
https://lnkd.in/dD8cM-hD
The Wells Expert Committee/Well Control Incident Subcommittee believes that this incident description offers an adequate number of lessons for industry dissemination. We strongly advise that the recipients of this email disseminate it within their organisation.
Construction Manager / AWS CWI QCS WorkRise (Energy Transfer)
4moRip my friend. Guys in this life you don’t meet but a handful of people that are 100% solid, Shaun was definitely one of those. He was a man of faith, family and hard work. You will be dearly missed brother.