Deepak Kumar’s Post

View profile for Deepak Kumar, graphic

Extrusion specialist, Co-Extrusion lamination, Siliting, Extrusion sheet, lines, biodegradable Extrusion coating, manager also Maintenance, installation with production started in flexible printing & packaging industry

👉👉 KAIZEN TEMPLATE” 🖍️⏩ This template ensures a structured approach to implementing and documenting Kaizen events, focusing on continuous improvement and standardization while recognizing and rewarding team efforts. 🖍️1. Kaizen Theme⏩ Type of Improvement: To Improve: e.g., Productivity improvements To Reduce: e.g., Cost reduction To Eliminate: e.g., NVA (Non-Value Added) activities elimination Chosen Theme: Specify which type of improvement this event focuses on. 🖍️🖍️2. Problem Identification/Initial Condition⏩ Use 5W1H Method: Who: Identify the stakeholders involved. What: Describe the issue or process to be improved. Where: Specify the location of the issue. When: Indicate when the issue occurs. Why: Explain why this issue needs to be addressed. How: Describe how the issue manifests. 🖍️🖍️🖍️3. Analysis⏩ Why-Why Analysis: Perform a Why-Why analysis to identify the root cause of the problem. Root Cause: Identify the root cause based on the analysis. Countermeasures: Detail the countermeasures to address the root cause. 🖍️🖍️🖍️🖍️4. Before Kaizen⏩ Previous Condition Images: Include images showing the condition before the Kaizen event. 5. After Kaizen⏩ Improved Condition Images: Include images showing the condition after the Kaizen event (ensure photos are taken from the same distance and view as the before images). 6. Benefits⏩ Identify Benefits (P, Q, C, D, S, M, E): Productivity: Describe productivity improvements. Quality: Describe quality enhancements. Cost: Detail cost reductions. Delivery: Describe improvements in delivery times. Safety: Detail safety improvements. Morale: Describe the impact on team morale. Environmental/Energy: Describe environmental or energy efficiency improvements. 7. Standardize⏩ Standardization: Detail how the improvement has been standardized (e.g., OPL, SOP, MP, PM, FMEA, etc.). 8. Horizontal Replication Replication Plan: Describe how the improvement will be implemented in other areas (e.g., same machines, functions, departments). 9. Documentation⏩ Upload/Process Documentation: Specify whether the documentation will be uploaded online or processed offline in your workflow. 10. Recognition and Rewards⏩ Completion Recognition: Describe how the completion of the work will be recognized and rewarded. Team Recognition: Detail any rewards or recognition given to team members. #kaizen #industry #plasticfild #injectionmolding #quality #plastcproduct #safety #cast #delivery #energy

  • No alternative text description for this image

To view or add a comment, sign in

Explore topics