Engineers Mate®’s Post

CASE STUDY: 4X LONGER CONVEYOR CHAIN LIFE FOR FRENCH SAWMILL WITH TSUBAKI TITAN CHAIN The proof is in the pudding – and with case studies like this, there’s no wonder we stock Tsubaki chains for fast next day delivery throughout the UK. The challenge: A sawmill in central France faced recurring challenges with its screw conveyor system. Situated outside, it was exposed to seasonal changes and the ingress of wood fibres. The conveyor's 16B-1 drive chain experienced rapid wear and elongation, needing replacement every six months. The frequent downtime for maintenance and the escalating procurement costs of replacement chains significantly impacted the sawmill's productivity and bottom line. The solution: The sawmill turned to Tsubaki, a renowned leader in industrial chain solutions, who suggested the Titan Chain RS16B-1 as the ideal solution for their challenging environment. The Tsubaki Titan Chain RS16B-1 boasts several innovative features tailored to withstand harsh conditions. Nickel-plated outer link plates and black oxide inner link plates offer enhanced corrosion resistance, while ring coining around the pin hole adds strength, allowing the chain to operate at its full capacity. Additionally, shot peening enhances resilience to stress corrosion, crucial for heavy-duty applications like the sawmill's screw conveyor. The outcome: Eight months into the installation, the Tsubaki Titan Chain has exceeded expectations, showing no signs of deterioration or elongation. Based on test procedures and past installations in similar environments, Tsubaki anticipates the Titan Chain to outlast the previous chain by at least four times, significantly reducing maintenance frequency and associated costs. Key benefits: ·      Reduced Total Cost of Ownership (TCO): By investing in the Tsubaki Titan Chain, the sawmill has substantially lowered its TCO by minimising procurement expenses and maintenance downtime. ·      Enhanced durability: The Titan Chain's advanced design and engineering ensure long-term performance, even in the most demanding operating conditions. ·      Improved productivity: With decreased downtime and maintenance requirements, the sawmill has experienced enhanced productivity and operational efficiency, positively impacting its bottom line. Contact your local Engineers Mate® depot for more information on how we can help your business. #IndustrialChains #SawmillSolutions #ProductivityBoost

To view or add a comment, sign in

Explore topics