GEMINI TECHNO SOLUTIONS’ Post

View profile for GEMINI TECHNO SOLUTIONS, graphic

BIS | WPC | EPR | PRO | E-Security & Survelliance | IT & Banking Automation |

🌍 E-Waste Recycling Capacity Guidelines 🌍 📢 The Central Pollution Control Board (CPCB) have issued essential guidelines for determining the processing capacity of e-waste recycling facilities. Here’s a quick breakdown: Processing Capacity Assessment: Recycling facilities’ capacities should be evaluated based on the installed equipment’s hourly capacity (max 20 hrs/day). Space Requirements: Facilities must ensure adequate space for: Recycling operations (dismantling, shredding, separation, smelting, etc.) Storage for raw materials, recycling products, non-recyclables, and hazardous waste Pollution control equipment Approval Verification: SPCBs/PCCs will verify capacity and facilities before granting operational permits, specifying capacity in tonnes per annum. ♻️ Let’s pave the way for sustainable e-waste management! ♻️ #EcoFriendly #EWasteRecycling #Sustainability #SPCB #CPCB

  • No alternative text description for this image

To view or add a comment, sign in

Explore topics