Integrated Projects’ Post

That's 9 out of 10 BIMIT projects, on-time... 🤯

View profile for Jose Luis Cruz, Jr, graphic

Scan-to-BIM made simple for AEC | Founder at Integrated Projects | Buildings 2.0

Imagine bringing 1+ million square feet of commercial buildings online per month with 91% on-time delivery. …a level of reliability in project delivery that hasn’t existed in the AEC sector at that scale. I sat down with my colleague Preston Smith, Head of BIM Operations, at Integrated Projects to talk: • How he transitioned from a CAD Draftsman to BIM Manager to Software Engineer • How BIMIT’s global demand has forced standardization on the BIM production and QAQC process. • How increased BIMIT demand in 2024 crashed the production process to a low point of 1% on-time delivery, and how the BIMIT Network turned it around. This has been one of my favorite conversations on Buildings 2.0—excited for this one to go live soon. Stay tuned!

  • No alternative text description for this image
  • No alternative text description for this image

To view or add a comment, sign in

Explore topics