Rudge Brothers and James - Floor coverings and Altro Whiterock Premier Installer

CFA Guide to Contract Flooring SITE CONDITIONS & ATTENDANCES ;   So that floorings can be kept in the room and brought to room temperature (acclimatised) before installation. It is equally important to maintain those temperatures for 24 hours after installation or until the adhesive has cured.   With fully flexible vinyl’s and linoleums flexibility is important for a good and safe installation. At low temperatures these floorings will harden up making them difficult to apply and with rolls of floorings, difficult to unroll (without cracking) and achieve a satisfactory lay-flat condition.   In all cases, the minimum subfloor surface temperature should be no less than 10°C. It is essential with most floor coverings that they are laid in the same humidity conditions as would be expected to be prevalent in use. Temporary heating equipment which may be used to warm buildings to achieve the required temperature can also increase the humidity to a markedly higher level than would normally be expected.   Also, turning off heaters at night in cold weather will lead to condensation as the air cools, causing water pooling on the surface of the floor. #building #buildingconstruction #buildingcontrol #construction #constructionindustry #constructionmanagement #constructionnews #constructionprojects #flooring #flooringsolutions #flooringinstallation

  • No alternative text description for this image
Jayson Parker

Floorlayer Sub Contractor

9mo

no heat...? no Sheet...!!

Like
Reply

To view or add a comment, sign in

Explore topics