Mark Poehl’s Post

View profile for Mark Poehl, graphic

Sr. Project Manager at Red River Storm Water - CESSWI

🌿🛠 Field Photo Friday: Navigating Erosion Control Challenges 🛠🌿 Happy Friday, everyone! Continuing our Field Photo Friday series, today's snapshot shines a light on a common issue in erosion control/SWPPP compliance—a reminder that challenges in the field aren't always straightforward. 📸 Take a look: rip-rap installed in a channel before stabilizing the adjacent disturbed lot. But here's the kicker: amidst concurrent projects, unpredictable weather, and occasional engineering/design hiccups, this oversight isn't uncommon. ⚠️ Why the concern? Picture this: sediment-laden discharge flowing into the channel due to inadequate stabilization. The result? Potential erosion and downstream contamination, alongside significant costs for rip-rap and downstream spoil removal. 🔍 We're not alone in this struggle: Many face similar hurdles, grappling with tight timelines, strict budgets, Mother Nature's unpredictability, and the occasional design snag. 💡 The key? Proactive planning. By synchronizing stabilization efforts with erosion control installations and accounting for these limitations, we can mitigate risks and minimize financial strains. Let's keep the dialogue flowing! How do you navigate through similar challenges in your projects? Share your insights below!   #FieldPhotoFriday #ErosionControl #SWPPPCompliance #ProjectChallenges #EnvironmentalResilience #RedRiverStormWater🌱🚧

  • No alternative text description for this image
Mark Poehl

Sr. Project Manager at Red River Storm Water - CESSWI

8mo
Like
Reply

To view or add a comment, sign in

Explore topics