Milhouse Engineering and Construction, Inc.’s Post

At a BP facility in Illinois, we are modernizing electrical and controls infrastructure. To avoid operational disruption, we are routing electrical cables through elevated trays in an adjacent building, avoiding excavation near sensitive underground conduits and equipment. Utilizing Autodesk Plant 3D and BIM360 Collaborative software, we developed the project using precise 3D models created through point cloud scanning. This approach ensures seamless integration of new systems with existing infrastructure, maintaining the station's operational integrity throughout the upgrade process. Learn more:https://bit.ly/3BdnKMZ #naturalgasindustry #gasengineering #civilengineering #structuralengineering #electricalengineering #MilhouseProjectSpotlight

  • No alternative text description for this image

To view or add a comment, sign in

Explore topics