After several years planning and vetting, J-POWER USA selected the M501JAC gas turbine due to its efficiency, longevity, reliability, and adaptability needed for future demands. They knew the JAC units had cutting-edge capabilities, able to start quickly – reaching maximum capacity in as little as 30 minutes in a combined-cycle system. In addition, the flexible turbines can adjust their output to handle fluctuating electricity demand and can run on a mixture of 30% hydrogen without major modifications. That critical combination of flexibility and reliability made a compelling case for the units’ longevity in a fast-changing industry. “You don’t make an investment like this to turn off in 20 years. You’re making an investment for the long term, and part of that investment is having a partner who’s willing to walk down that road with you and help you out.” – Kevin Miller, VP of Asset Management, Operations, and Construction, J-POWER USA Learn more about why Jackson Generation is a plant fit for the future here: https://bit.ly/4d8fXNp #MitsubishiPower #CleanEnergy #EnergyTransition #Collaboration

Robert Thompson

Seeking - Electrical or I&C Lead Position in Plant Startup and Commissioning

4mo

Had the pleasure of commissioning some of the M-501J turbines with Sojyi-san. Great projects!

Like
Reply

To view or add a comment, sign in

Explore topics